Similar Projects
SOF Advanced Skills Training Facility Annex and HAZMAT Facilities
- 24,500 SF
Design
$10,000,000 to $25,000,000 est. value
Fort Bragg, NC 28542

Y--Design-Bid-Build (Dbb) P990 F-35B Vertical Lift Fan Marine Corps Air Station, Cherry Point, North Carolina.
New Construction - 10,500 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Cherry Point, Havelock, NC 28533

Renovate/Expand Munitions Storage Area
Renovation, Addition - 3,060 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Charlotte, NC 28105

Z--Repair Bachelor Enlisted Quarters FC515, Camp Lejeune, North Carolina
Results
$5,000,000 to $10,000,000 est. value
Camp Lejeune, NC 28547

Y--Design-Build, P680 CH-53K Cargo Loading TowerMarine Corps Air Station New River, NC
New Construction - 9,795 SF
Results
$10,000,000 to $25,000,000 est. value
Camp Lejeune, NC 28445

Design-Build Services for Hoke County's Parks and Recreation Building and Cooperative Extension Building
New Construction - 42,000 SF
Construction
Less than $12,200,000 est. value
Raeford, NC 28361

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

PN 87539 SOF Operations Facility Secure Work Area
Renovation
Results
$1,000,000 to $5,000,000 est. value
Fayetteville, NC 28307

Y--Design-Build (DB) P-1495 5th Battalion, 10th Marines, High Mobility Artillery Rocket System (HIMARS) located at Camp Lejeune in North Carolina
New Construction
Results
$25,000,000 to $100,000,000 est. value
Camp Lejeune, Holly Ridge, NC 28445

B-87 & B-85 Renovations
Renovation
Results
Cherry Point, NC 28533

SOLICTATION - P1800/1801, DESIGN BUILD 2nd Marine Division and 2nd MLG Operations Center, Camp Lejeune, NC
New Construction
Results
$100,000,000 to $250,000,000 est. value
Camp Lejeune, NC

Hurricane Florence Recovery Milcon Package 2
New Construction - 227,300 SF
Results
$100,000,000 to $250,000,000 est. value
Camp Lejeune, NC

SOF Assessment and Selection Training Complex
Results
$10,000,000 to $25,000,000 est. value
Fort Bragg, NC

Morganton Regional Readiness Center, Phase II New Construction
New Construction
Results
Morganton, NC 28655

P-204, Design-Bid-Build, F-35 Training and Simulator Facility, Marine Corps Air Station MCAS Cherry Point, North Carolina
New Construction - 64,700 SF
Results
$25,000,000 to $100,000,000 est. value
Cherry Point, NC

Last Updated 10/14/2020 04:22 PM
Project Title

Hurricane Florence Recovery MILCON Package 1

Physical Address View project details and contacts
City, State (County) Cherry Point, NC   (Craven County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000 to $250,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This solicitation will result in a firm-fixed price (FFP) contract for design-build (DB) construction services. This Package include the following MILCON Projects: P162 - PMO/H&HS & MWHS-2 Headquarters Constructs a 23,000 square foot two-story security building and a 15,000 square foot two-story Headquarters & Headquarters Squadron (H&HS) and Marine Wing Headquarters Squadron (MWHS-2) facility. The buildings will be concrete masonry unit with brick veneer exterior and standing seam metal roof. The new security facility will be comprised of the following areas: a Command Staff (HQ); Operations Division; Accident Investigation Section (AIS); Special Reaction Team (SRT); Naval Criminal Investigation Service (NCIS); PMO Supply; traffic court; Services/Administrative Division; weapons storage; emergency dispatch center; motor transport; animal control; training; physical security; detention cells; exercise/fitness room; galley/breakroom; and male and female lockers/shower area and bunk rooms. The Operations Division area will include executive office spaces, space for finger print lab, interrogation rooms, observation rooms, ready storage locker, evidence room to include a vault, male and female locker/shower area, meeting/conference room, and armory ready store room. The NCIS area will include executive office spaces, space for finger print lab, interrogation rooms, observation rooms, ready storage locker, evidence room to include a vault, SIPR Room, male and female locker/shower area, graphic work station, and armory ready store room. The H&HS and MWHS-2 Headquarters facility will consist of administration space for both squadron's personnel and for the Safety & Standardization Department. Site improvements include demolition, paved roads, parking, and fencing. P130 - Motor Transportation/Communication Shop Constructs a 36,000 square foot vehicle maintenance shop. Construction will consist of single story reinforced concrete masonry unit building with pile foundation, reinforced concrete slab, structural steel frame, steel trusses, and standing seam metal roof. The new facility will include a vehicle maintenance shop, tool rooms, communication maintenance shop, storage areas, a classroom, exterior elevated vehicle wash rack with associated oil/water separator, enclosed battery storage, and administrative offices. Site improvements include roads, parking, utilities, and fencing. P142 - Fire Stations Replacement Constructs a 32,000 square foot main fire station with five bays and a 12,000 square foot satellite fire station with two bays. Construction will include a fire hose drying rack, storage room, dayroom, training area, dining room, kitchen, exercise room, medical supply storage area, boat storage, administrative space, dispatch center, workroom, laundry, fire extinguisher maintenance room, self-contained breathing apparatus (SCBA) room, toilets and shower rooms for male and females, and individual sleeping quarters with personnel lockers. Built-in equipment includes a compressed air system for vehicle maintenance, fireman gear lockers, overhead vehicle doors, equipment racks, raised flooring, fire pump, vehicle bay radiant heating, grease trap, overhead hose reels, gear washer/dryer/extractor, cascade system for SCBA room testing, public address system, built-in work benches, vehicle exhaust system and emergency generator. Site improvements include utilities, parking, roadway and intersection improvements. P246 - BT-11 Range operations Center Replacement Constructs a 15,000 square foot Range Operations Center to support range management activities at BT-11. This facility will house the range operations and support center, Weapons Impact Scoring System, electronics maintenance shop, public works maintenance shop, general purpose warehouse and appropriate support spaces. Construction will consist of concrete masonry unit, steel frame with metal panels on concrete foundation and a single ply roof. Site improvements include utilities and roadway. The site is only accessible by boat. P254 - Station Academic Facility/Auditorium Constructs a 21,000 square foot general purpose auditorium to provide an assembly area for instruction, training, and movies. The new facility will include adequate space for instruction/training, entrance and support spaces. Construction will consist of steel framing with reinforced concrete masonry unit with reinforced masonry walls, brick veneer, reinforced concrete floors and standing seam metal roof. Built-in equipment includes a stage, overhead doors, projector, screen, sound system, noise attenuation, seats and retail kitchenette. Site improvements includes demolition, utilities, and a parking lot.

Details

,, 68,000 SF - 1 Fire/Police Station, Approximately 32,000 SF New Construction, 1 Military Facility, Approximately 15,000 SF New Construction, 1 Misc. Buildings, Approximately 21,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents