Similar Projects
The Yard Milkshake Bar
Build-Out
Conception
Fort Worth, TX 76104

AutoZone #0333
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Haslet, TX 76052

Arbrook Retail Center
Renovation - 6,200 SF
Design
Arlington, TX 76015

Walmart Supercenter #5416-248 - SPRB-1
Renovation - 188,416 SF
Design
Arlington, TX 76011

Walmart Supercenter #2980-254 - OGP-CE
Renovation - 199,777 SF
Bidding by Invitation
Fort Worth, TX 76244

JD Sports
Renovation - 8,017 SF
Post-Bid
Arlington, TX 76015

AutoZone #5991
New Construction - 7,147 SF
Post-Bid
$500,000 to $1,000,000 est. value
Fort Worth, TX 76131

AutoZone #3133
Addition - 1,860 SF
Construction
Mansfield, TX 76063

Five Below
Build-Out
Construction
$180,000 est. value
Fort Worth, TX 76123

Keller Town Center
New Construction - 9,755 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Keller, TX 76248

Sport Clips
Build-Out
Design
Fort Worth, TX 76028

Dollar Tree
Renovation - 12,378 SF
Post-Bid
Fort Worth, TX 76123

Ollie's Bargain Outlet
Renovation
Construction
Benbrook, Fort Worth, TX 76116

Walmart Supercenter #284-253 - OGP-GB2
Renovation - 850 SF
Design
Mansfield, TX 76063

Target #1766 Parking Lot
Renovation
Post-Bid
Hurst, TX 76053

Last Updated 12/24/2020 10:11 AM
Project Title

AutoZone #6716

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76934   (Tarrant County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Construction Commenced May 2020, Construction Complete as of October 2020
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Retail, 1 Story Above Grade, 7,147 SF New Construction.
Division 01 - General Requirements, Quality Control, Testing Laboratory Services, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Lightweight Concrete Roof Insulation.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Exterior Insulation and Finish Systems, Weather Barriers, Membrane Roofing, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof Accessories, Joint Sealants.
Division 08 - Openings, Metal Frames, Hollow Metal Frames, Metal Doors, Hollow Metal Doors, Wood Doors, Plastic Doors, Coiling Doors and Grilles, Overhead Coiling Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Storefronts, Aluminum-Framed Storefronts, Fire-Rated Aluminum Storefronts, Windows, Door Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Cement Plastering, Cement Stucco, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Interior Wall Paneling, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Low-Voltage Electrical Service Entrance, Switchboards and Panelboards, Panelboards, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Erosion and Sedimentation Controls, Stabilization Measures for Erosion and Sedimentation Control, Earthwork Methods, Soil Treatment, Termite Control.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents