Similar Projects
Walkway Replacement at Tyler Hall Courtyard
Infrastructure
Bidding
Newtown, PA 18940

Driveway/Parking Lot Improvements & Sidewalk Installation
Renovation
Post-Bid
Plumsteadville, PA 18949

Recreational Trail Extension
Post-Bid
Perkasie, PA 18944

Restoration of Concrete Sidewalks, Driveways, Aprons, Curbs and Sites Affected By Water Main Breaks
Results
Levittown, PA 19055

2020 Road Program
Results
Doylestown, PA

2021 Roadway Improvement Program
Infrastructure
Post-Bid
$166,200 est. value
Newtown, PA 18940

2020 Curb Ramp Installation
Results
Warminster, PA 18974

2021 Eddington Area Curb Replacement Project
Infrastructure
Post-Bid
Bensalem, PA

Concrete Slab and Walkways - Middletown Community Park
Results
$40,000 to $70,000 est. value
Langhorne, PA 19047

Race Street ADA Curb Ramp Renovations
Infrastructure
Post-Bid
Philadelphia, PA 19107

2020 Road Improvement Program
Results
Fairless Hills, PA 19030

2020 Roadway Improvement Program
Results
Less than $130,000 est. value
Newtown, PA 18940

Richardson House Walkway Renovation Project
Results
$40,000 to $50,000 est. value
Langhorne, PA

ADA Curb Ramp Accessibility Improvements
Results
Morrisville, PA 19067

New Road Trail Head
Results
Holland, PA 18966

Last Updated 09/10/2021 07:46 AM
Project Title

Waterfront Park Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Bristol, PA   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves a Base Bid for the resurfacing of the parking lot at the Bristol Borough Waterfront Park and Alternate Bids to remove and replace sections of existing storm pipe and inlets in the parking lot, install ADA compliant curb ramps, replace pavement markings, install and maintain Erosion & Sediment Controls and traffic controls. All material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408 and Borough Standards.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents