Similar Projects
Brandon Middle School Renovations
Renovation
Conception
Ortonville, MI 48462

Brandon High School Renovations
Renovation
Conception
Ortonville, MI 48462

BP5 Conant and Way Additions
Addition
Bidding
Bloomfield Hills, MI

Summer 2022 District Wide Renovations
Renovation
Bidding
Auburn Hills, Rochester Hills, Troy, MI 48326

Anderson Middle School Cafeteria Addition
Addition
Post-Bid
Berkley, MI 48072

Novi Middle School Secure Entry and Music Wing Addition
Addition
Post-Bid
Novi, MI 48374

Oxford Community Schools 2017 Bond, Series 2
Build-Out
Results
Oxford, MI

Oxford Community Schools Series 2 Bid Pack 4
Results
Oxford, MI

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

Bid Package 22-03: Waterford Schools Stepanski ECC Phase 2 Building
New Construction
Bidding
Waterford, MI

2019 Bond Projects - Bid Package 4
Post-Bid
West Bloomfield, Wixom, MI 48323

Summer 2020 Renovation Projects
Renovation
Results
Ferndale, MI 48237

Brother Rice High School: D-Wing HVAC & Fire Protection Upgrades
Renovation
Bidding
Bloomfield Hills, MI 48301

Bid Package 4 - Elementary Schools Additions and Remodeling, Concessions, HS Pool HVAC's, and MHS Parking lot and Upgrades
Renovation, Addition
Post-Bid
MI 48357

Elementary Secure Entries
Results
Novi, MI

Last Updated 01/07/2022 03:51 PM
Project Title

Bid Package 5 Power Middle School

Physical Address View project details and contacts
City, State (County) Farmington Hills, MI 48335   (Oakland County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

107: Structural and Miscellaneous Steel 108: Carpentry and General Trades 109: Roofing 116: Hard Tile 117: Acoustical Treatment 118: Carpet and Resilient Flooring 120: Painting 126: Metal Lockers 131: Athletic Equipment 140: Plumbing 142: HVAC 143: Electrical 167: Track Surfacing

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents