Similar Projects
HVAC Preventative Maintenance Services, NWS Romeoville, IL
Post-Bid
Romeoville, IL 60446

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Connect B1 W Penthouse to Central Chiller Plant
Post-Bid
Marion, IL 62959

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

HVAC Inspection, Analysis & Preventative Maintenance
Term Contract
Post-Bid
Rockford, IL 61104

2020 HVAC Replacement
Results
Wheeling, IL 60090

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

Hot Water Heater Replacement
Results
Rock Island, IL 61201

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

Shawnee Community College Emergency HVAC
Renovation
Results
$75,000 to $100,000 est. value
Ullin, IL 62992

On Call HVAC Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Last Updated 11/19/2020 04:18 PM
Project Title

HVAC Upgrades - Herndon Building

Physical Address View project details and contacts
City, State (County) Springfield, IL 62756   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation and improvements of multiple HVAC systems.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement, Glovebag Asbestos Abatement.
Division 05 - Metals, Cold-Formed Metal Framing, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Firestopping.
Division 08 - Openings, Metal Doors and Frames, Stainless-Steel Doors and Frames, Access Doors and Panels, Access Doors and Frames, Door Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board Assemblies, Gypsum Board Assemblies, Acoustical Ceilings, Acoustical Panel Ceilings, Resilient Flooring, Resilient Base and Accessories, Painting, Interior Painting, High-Performance Coatings.
Division 22 - Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Vibration and Seismic Controls for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping, Facility Water Distribution, Domestic Water Piping, Domestic Water Piping Specialties, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Sanitary Waste Piping Specialties.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Equipment Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Control Valves, Control Dampers, Sequence of Operations for HVAC Controls, Facility Fuel Piping, Facility Natural-Gas Piping, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Piping Specialties, Hydronic Pumps, HVAC Water Treatment, Water Treatment for Closed-Loop Hydronic Systems, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, HVAC Fans, HVAC Power Ventilators, Air Terminal Units, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Breechings, Chimneys, and Stacks, Heating Boilers, Condensing Boilers, Central HVAC Equipment, Custom-Packaged Outdoor HVAC Equipment, Custom-Packaged, Outdoor, Central-Station Air-Handling Units, Convection Heating and Cooling Units, Air Coils, Fan Coil Units.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Underground Ducts and Raceways for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Switchboards and Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Low-Voltage Controllers, Enclosed Controllers, Variable-Frequency Motor Controllers, Interior Lighting, Emergency Lighting, Exit Signs.
Division 27 - Communications, Common Work Results for Communications, Pathways for Communications Systems, Communications Horizontal Cabling.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Pathways for Electronic Safety and Security, Fire Detection and Alarm, Digital, Addressable Fire-Alarm Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents