Similar Projects
Stucco Repair and Replacement Windows
Alteration
Bidding
Carrizozo, NM 88301

Aircraft Hangar Door Maintenance & Repair
Alteration
Bidding
Clovis, NM

DMD-ED Large Bay Door Maintenance, Repair, Replacement
Term Contract
Post-Bid
Albuquerque, NM

Windows and Doors for Two Homes
Post-Bid
Bernalillo, NM

Campus-Wide Door Security Lock Systems
Results
Socorro, NM

Commercial Building Window Tinting and Coating
Term Contract
Results
Albuquerque, NM

Door and Hardware Maintenance and Repair
Alteration
Post-Bid
Less than $250,000 est. value
Rio Rancho, NM

Glass/Window/Door and Hardware Replacement and Repair Services
Results
Clovis, NM

On-Demand Window Tinting and Installation Services
Alteration
Post-Bid
NM

Glass and Window Replacement Services
Alteration
Results
$250,000 to $350,000 est. value
Albuquerque, NM

On-Call Bay Door Repair and Maintenance Services
Alteration
Post-Bid
Alamogordo, NM 88310

ASL ADA Automatic Door Upgrade
Term Contract
Results
Albuquerque, Kirtland, NM 87151

On Call Overhead Door Services
Alteration
Post-Bid
NM

Planning, Design, Construction and Make Improvements
Renovation, Alteration
Results
Cuba, NM

Main Entrance Enclosed Cover With Automatic Doors
Term Contract
Post-Bid
Gallup, NM 87301

Reported 06/10/2022 12:00 AM
Project Title

Overhead Door Replacement

Physical Address View project details and contacts
City, State (County) Santa Fe, NM 87508   (Santa Fe County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $375,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is at 47 Bataan Blvd. #54 CSMS Building in Santa Fe, NM. a. Evaluate the facility against the door installation requirements and provide a determination outlining the best method to be utilized in order to meet the general requirements of the door manufacturer. The Contractor will provide immediate notification to project manager (PM) of any concerns. b. Supply all material and equipment necessary to complete the project. All products installed will have the appropriate fire rating for the area in which being installed. c. Ensure all material is installed per manufacturer's specifications and in compliance with all national door installation standards. d. Replace and properly label all electrical fixtures. e. Clean work area and secure site daily.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents