Similar Projects
SMU Building
New Construction - 226,900 SF
Conception
$10,000,000 CJ est. value
Oakland, CA 94607

Alameda County Fire Department Training Center - #20142 - Alameda County
New Construction, Infrastructure
Conception
$30,056,880 CJ est. value
Dublin, CA 94568

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

High Friction Surface Treatment
Infrastructure
Bidding
$3,540,000 CJ est. value
Sunol, CA 94550

College of Alameda Construction Management Services Aviation Modernization Phase 2
Renovation, Alteration
Post-Bid
Oakland, CA 94606

College of Alameda - Phase II - Surveying
Renovation
Post-Bid
Alameda, CA 94502

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

Hayward Maintenance Complex (Phase 2) Civil Grading
Infrastructure
Results
$20,000,000 to $40,000,000 est. value
Hayward, CA

Shattuck Avenue Apartments
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Berkeley, CA 94704

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Admirals Cove Infill
Demolition, New Construction, Infrastructure - 348,850 SF
Pending Verification
$72,011,310 CJ est. value
Alameda, CA 94501

7TH/Anthony Traffic Signal Project - PWTRCT1605 - City of Berkeley
Infrastructure, Alteration
Conception
$1,414,500 est. value
Berkeley, CA 94710

Villa Fruitvale
New Construction, Infrastructure - 6,000 SF
Design
$68,000,000 CJ est. value
Oakland, CA 94601

Last Updated 10/18/2022 07:07 PM
Project Title

RFQ Contractor - Design-Assist Exterior Skin and Design-build Fire Sprinkler Trade Prequalification

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94704   (Alameda County)
Category(s) Education, Green Building, Heavy and Highway
Sub-Category(s) College/University, LEED Certified, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

XL Construction has been awarded the UC Berkeley Bechtel Engineering Center project, a student services building, to renovate the existing two-story cast-in-place concrete building and add a two-story addition on top. The addition will be approximately 36,000sf and the renovation approximately 15,000sf. The buildout will include offices, meeting and assembly spaces, lounges, classrooms, a café, and roof terraces. Construction is scheduled to begin Summer 2023 and finish Q4 2024. This project is seeking either LEED Silver or Gold. The addition will consist of primarily glazing with accents of metal cladding, and a signature canopy. The existing lower two floors existing skin will be replaced with glazing and a new solid panel rainscreen system or alternative panel system. XL is seeking design-assist exterior glazing and cladding subcontractors and design-build fire sprinkler subcontractors who are interested in joining the project team. Scopes will be awarded based on lowest lump sum bid. Group Bid Package # Trade Estimate Value 2 3 Exterior Skin - Design-Assist $6,000,000 - $8,500,000 2 4 Fire Sprinklers - Design-Build $400,000 - $500,000 For questions, please contact Kristina Lee at klee@xlconstruction.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

,, 51,000 SF - 15,000 SF. 36,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents