Similar Projects
Last Updated | 08/23/2022 09:32 AM |
Project Title | Hawthorne Avenue Sewer Extension |
Physical Address | View project details and contacts |
City, State (County) | Reedsport, OR 97467 (Douglas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction complete as of August 2022 , Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $193,327 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CITY OF REEDSPORT HAWTHORNE AVENUE SEWER EXTENSION All interested parties are invited to attend. The project must be substantially complete 90 days after issuance of Notice to Proceed. Estimated construction cost for the Basic Bid is between $150,000 and $175,000. The project consists of the following major items of construction: 1. Basic Bid a. Install approximately 623 lineal feet (lf) of new 10-inch diameter sewer line, remove and replace one new flat-top manhole, one new shallow manhole, new water line improvements, ac pavement trench resurfacing, and related work items. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. Contact Engineer at (541) 269-0732 if you have any questions. All Bidders must be "equal opportunity employers" and comply with the appropriate provisions of state and federal law. In addition, all Bidders are required to comply with ORS 656.017 regarding Workers' Compensation. Bidder, Contractor, and subcontractors are required to be registered with Construction Contractors Board. Pursuant to ORS 279C.505(2), all Bidders must certify with their Bids that they have an employee drug testing program in place. If awarded a Contract, Bidder must provide proof of such drug testing program when executed Agreements are returned to Owner. Bidders must prequalify with Owner as specified in the Instructions to Bidders, five (5) days prior to Bid opening. Each Bidder must submit a First-Tier Subcontractor Disclosure Form to the Owner within two working hours of the time for receipt of Bids in accordance with ORS 279C.370. Each Bidder must also submit Evidence of Authority to Sign Bid and Evidence to do Business in the State within two working hours of the time for receipt of the Bid. The Contractor and every subcontractor on the project shall pay at least the state prevailing rate of wage as determined under ORS 279C.815. ORS 279C.800 to 279C.870 will be administered and enforced in a manner that is consistent with state law and regulations adopted or guidelines issued in accordance with related acts. No Bid will be received or considered by the Owner unless the Bid contains: 1) a statement that Bidder will comply with the provisions of 40 USC 276a and ORS 279C.840 and 2) a statement as to whether the Bidder is a resident Bidder as defined in ORS 279A.120. The Owner reserves the right to reject any or all Bids, to waive all informalities, and to accept such Bids that in the opinion of the Owner are in the best interest of the Owner. No Bidder may withdraw or modify this Bid after the hour set for the receipt of Bids, and thereafter until the lapse of 70 days from the Bid opening. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |