Similar Projects
System Preservation (Restoration/Rehab/Resurface)
Infrastructure
Bidding
$5,900,000 est. value
AZ

Roads NFSR 100 Surfacing and Stabilization
Infrastructure
Bidding
$250,000 to $500,000 est. value
Gray Mountain, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $1,900,000 est. value
Cameron, AZ

Fourth Street Reconstruction Project
Results
Flagstaff, AZ 86004

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Fredonia Highway (US 89A) (Sr 67 Jct to Nf-248d)
Infrastructure
Bidding
$5,900,000 est. value
North Rim, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Dry Creek Road Shared Use Path Improvements
Results
Less than $669,185 est. value
Sedona, AZ 86336

Flagstaff-Ash Fork Highway (I 40) (E Ash Fork Ti - Devil Dog Road)
Infrastructure
Bidding
$10,500,000 est. value
Williams, AZ 86046

Forest Road Connection Project
Infrastructure
Post-Bid
Sedona, AZ 86351

JOC - Street Maintenance Projects
Results
Sedona, AZ

Prescott - Flagstaff Highway (SR 89A) (SR 89 - Mp 322)
Infrastructure
Bidding
$4,300,000 est. value
Sedona, AZ 86351

N1012 3.50 Mile to Nanees Dizi, Road Improvement
Infrastructure
Post-Bid
Tuba City, AZ 86045

Last Updated 04/20/2022 07:27 AM
Project Title

Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement rehabilitation project is located in Coconino County within the Coconino National Forest on southbound I-17 from MP 311.27 to MP 340.34, northbound I-17 from MP 322.79 to MP 323.11 and southbound SR 89A from MP 401.95 to MP 402.05. The work consists of pavement rehabilitation and bridge rehabilitation. The work includes remove existing AC from PCCP pavement and replacing it with new ACFC; remove existing pavement including underneath materials and reconstructing with new AC and ACFC and removing existing pavement from AC pavement and replacing it with new AC and ACFC. The work also includes bridge deck repair and replacing bridge barrier; PCCP slab repair; spall and crack repairs; upgrading guardrail and median glare screen; replacing embankment curb and drainage inlets; installing pipe lining and pipe end sections; installing signing; re-striping and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents