Similar Projects
Floor Cleaning - Pope Army Air Field
Post-Bid
Fayetteville, NC 28308

Educational Resource Center VCT Replacement
Post-Bid
Fayetteville, NC 28301

NCMA Flooring Replacement - Fort Bragg
Results
Fort Bragg, NC

56--Modular Raised Floor for Operation Center
Results
Fort Bragg, NC 28306

Margaret Willis Elementary School Media Center Replace Carpet with VCT
Post-Bid
Fayetteville, NC 28305

Remove and Replace Flooring, Ceiling Tiles, and Paint Walls - Fayetteville Readiness Center
Results
Fayetteville, NC 28306

VCTY Replacement at Pauline Jones School
Post-Bid
Fayetteville, NC 28301

Floor Stripper and Finish
Post-Bid
Fayetteville, NC 28302

Fort Bragg Floor Repair
Post-Bid
Fort Bragg, NC 28310

Gray's Creek Elementary School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

Hope Mills Middle School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

William H. Owen Elementary School - VCT Replacement
Post-Bid
Fayetteville, NC 28304

Pine Forest Middle School - VCT Replacement
Post-Bid
Fayetteville, NC 28311

Margaret Willis Elementary (Admin Area) - VCT Replacement
Post-Bid
Fayetteville, NC

Remove and Replace Fayetteville FMS11 Facility Floors
Post-Bid
Less than $44,575 est. value
Fayetteville, NC 28306

Reported 05/25/2021 12:00 AM
Project Title

Install VCT in Seven Classrooms and Adjoining Storage Areas and Offices - Pauline Jones Elementary School

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install VCT flooring in seven classrooms and adjoining storage areas and offices. 1. Contractor to install Kovara MBX moisture barrier underlayment over concrete substrate. 2. Contractor to install 12” x 12” VCT tile- (51899). 3. Up to 10% allowance for Accent Color Tile. 4. Contractor will skim coat surface as needed before installing underlayment. 5. Contractor will provide quarter round molding to be painted by CCS staff on site. 6. Contractor will install quarter round molding in all areas. 7. Contractor will roll all VCT once installed. 8. Contractor will be responsible for disposal of all materials. 9. CCS will remove all furniture as needed.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents