Similar Projects
Plant/Boiler Master Control System Replacement
Renovation
Sub-Bidding
$773,000 CJ est. value
Buffalo, NY 14202

Highway Garage HVAC Upgrades and Repairs
Renovation
Sub-Bidding
$100,000 CJ est. value
Lake View, NY 14085

Renovate Sports Arena Ice Rink Refrigeration System at Buffalo State College
Alteration
Post-Bid
Buffalo, NY 14222

Replace Various Air Handling Units and Controls at Bacon Hall at Buffalo State
Alteration
Post-Bid
Buffalo, NY 14222

Cooke Hall - Chilled Water Upgrades at Building Entrance
Alteration
Results
Buffalo, NY 14260

Furnas Hall - Chilled Water Upgrades at Building Entrance
Alteration
Results
Buffalo, NY 14260

Lockwood Library - Chilled Water Upgrades at Building Entrance
Alteration
Post-Bid
Buffalo, NY 14228

Senior Center HVAC improvements
Alteration
Results
$20,000 est. value
Tonawanda, NY 14150

HVAC Replacement at 485 Cayuga Road
Alteration
Post-Bid
Buffalo, NY 14225

Senior Center HVAC Improvements
Alteration
Results
Boston, NY 14025

Air Conditioner
Alteration
Post-Bid
NY

Lancaster CSD Renovations 2018 423 - HVAC
Renovation
Results
$956,400 CJ est. value
Lancaster, NY 14086

Senior Center HVAC Improvement Project
Alteration
Post-Bid
Depew, NY 14043

Southtowns AWTF Roof Replacement & Effluent HVU Replacement - General
Renovation
Results
$3,580,000 CJ est. value
Buffalo, NY 14219

A/C Replacement at School 90
Alteration
Post-Bid
Buffalo, NY 14211

Last Updated 05/10/2023 11:11 AM
Project Title

Town of Cheektowaga Air Conditioning Replacement

Physical Address View project details and contacts
City, State (County) Cheektowaga, NY 14227   (Erie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $35,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of town hall HVAC system Floor-to-floor heights at ground floor is approximately 9 ft, first and second floors approximately 13-14 ft. The project phasing will begin at ground floor routing new HVAC piping/ductwork and power, then second phase will be removal of ceilings at first floor to install HVAC and power, then third phase will be removal of ceilings at second floor to install HVAC and power, fourth phase will be reinstallation of ceilings and light fixtures after HVAC pressure testing and above-ceiling punch lists. During construction of this project there will be contractors performing a window replacement project and contractors performing an elevator replacement project. The new elevator will be made available for usage for contractors.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents