Similar Projects
Henry Street, Joni Avenue, and Lenox Avenue - Road Improvements
Bidding
Hamilton Township, NJ

Maintenance Job Order Contracting (Joc) Infrastructure Repairs, Central - 2021
Bidding
$5,000,001 to $10,000,000 est. value

Village Road East Reconstruction
Post-Bid
West Windsor, NJ

Alexander Road Phase 4
Post-Bid
West Windsor, NJ

Resurfacing and Improvements to Old Cranbury Road, Rocky Brook Road, and Holland Lane
Results
$406,691 est. value
NJ

Resurfacing and Improvements to Oak Creek Road and Heathwood Drive
Results
$367,745 est. value
NJ

FY 2018 NJDOT Trust Fund Resurfacing of Combs Road
Post-Bid
Robbinsville, NJ 08691

Resurfacing and Associated Repairs for Cypress Drive between Meadowbrook Road and One Mile Road South and all of Spruce Road
Results
$322,978 est. value
East Windsor, NJ 08520

Improvements to Heatherstone, Princeton, NJ
Post-Bid
Princeton, NJ 08540

Reconstruction of Warren Street/ West State Street Intersection
Results
Trenton, NJ 08608

2019 / 2020 Road Improvement Program - Phase I
Post-Bid
Lawrenceville, NJ 08648

Burd Street Reconstruction and Abey Drive and Kings Court Reconstruction
Results
$561,417 est. value
Pennington, NJ 08534

Resurfacing and Associated Repairs for Portions of Dutch Neck Road between Hightstown Borough and 400’ West of US Highway 130 and portions of Morrison Avenue between Hightstown Borough and Dutch Neck Road
Post-Bid
East Windsor, NJ 08520

Silvia Street Extension
Results
$7,673,163 est. value
Ewing, NJ 08618

Resurfacing and Associated Repairs for Shagbark Lane and Charred Oak Lane
Post-Bid
East Windsor, NJ 08520

Last Updated 05/03/2021 08:10 AM
Project Title

Pennington-Titusville Road Improvements

Physical Address View project details and contacts
City, State (County) Hopewell Township, NJ   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work on this project generally includes approximately 15,175 SY HMA Milling, 100 CY Excavation (Unclassified) (If and Where Directed), 300 SY HMA Pavement Repair (If and Where Directed), 1000 LFSealing of Cracks in HMA Base Course (If and Where Directed), 2061 Tons HMA9.5M64 Surface Course 2" Thick, 40 LF Remove and Replace 6"X8"X18"Concrete Vertical Curb, 200 SY Remove and Replace Concrete Sidewalk, 4" Thick.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents