Last Updated | 07/10/2023 03:14 PM |
Project Title | Reconstruct Runway |
Physical Address | View project details and contacts |
City, State (County) | Decatur, IL 62521 (Macon County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reconstruct Runway reconstruct Runway 12/30 Airfield Guidance Signs, Relocate Taxiway G1 Through G4 Hold Position Signs & Marking and Reconstruct Airport Lighting Vault. Mobilization 1 - L Sum, Maintenance of Traffic - 1 L Sum, No. 8 Awg, 5 Kv, L-824, Type C Cable, Installed in Trench, Duct Bank, or Conduit - 4,000 Ft, Installation of Equipment Within Existing Vault in Place - 1 L Sum, Cable and Constant Current Regulator Testing and Calibration Procedures - 1 L Sum, Non-encased, Electrical Conduit, 1-way 2-inch C - 3,700 Foot, Electrical Junction Structure, L-867d Base Can - 12 Each, Airfield Electrical Demolition - 1 L Sum, Runway/taxiway Sign Size 2, Style 2 & 3, Class 2, 1-module - 3 Each, Runway/taxiway Sign Size 2, Style 2 & 3, Class 2, 2-module - 7 Each, Runway/taxiway Sign Size 2, Style 2 & 3, Class 2, 3-module - 5 Each, Remove Existing Markings 13,942 - Sq Ft, Permanent Painted Pavement Marking, With Reflective Media - 5,524 Sq Ft, Permanent Painted Pavement Marking, Without Reflective Media - 6,053 Sq Ft. Dec-5104, Decatur Airport, Reconstruct Runway 12/30 Airfield Guidance Signs, Relocate Taxiway G1 Through G4 Hold Position Signs & Markings, and Reconstruct Airport Lighting Vault Base Bid 1. Removing and replacing eleven (11) runway 12/30 airfield guidance signs. 2. Removing and replacing four (4) mandatory holding position signs on taxiway G1, G2, G3, and G4. 3. Upgrading the electrical vault Additive Alternate No. 1 a. Removal and re-marking of the existing holding positions, surface painted holding positions signs (SPHPS), enhanced taxiway centerlines, and taxiway centerlines. Questions may be submitted until 12:00 PM, Monday, July 3, 2023, to Michael Dudas at mdudas@hanson-inc.com as a Microsoft Word document. No questions will be accepted after that time. Bidders shall not contact Park District Employees, Agents, City of Decatur Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. The contract time for this contract is Base Bid: 96 calendar days; Additive Alternate #1: 26 additional calendar days. ILDOT - Decatur Airport, Reconstruct Runway The DBE goal for this contract is 0.0% |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |