Similar Projects
SE 8th Court Drainage Improvements
Bidding
$220,431 est. value
Delray Beach, FL

S-135 Bypass Culvert and Dike Repairs
Bidding
$2,142,200 to $2,361,776 est. value
West Palm Beach, FL

Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Post-Bid
North Palm Beach, FL

Vehicle Service Road Relocation
Post-Bid
$500,000 est. value
Palm Beach, FL

Shore Protection Project Jupiter Carlin Segment Beach Renourishment, Palm Beach County, Florida
Results
$10,000,000 to $15,000,000 est. value
Jupiter, FL

Wildflower Sewall Replacement
Results
Less than $1,550,000 est. value
Boca Raton, FL 33432

SNL Infrastructure Construction and Maintenance
Infrastructure
Bidding

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Drainage Outfall Rubble Rap
Infrastructure
Bidding
$500,000 est. value

Stormwater Retaining Wall and Drainage Improvements
Results
FL 33469

Unit 53 Arden – Parcels G-North And H-South Public Improvement Project
Infrastructure
Bidding
Palm Beach Gardens, FL

Original Section Drainage Improvements Phase 6
Results
Greenacres, FL 33463

KCS NASA Causeway Shoreline Repairs
Term Contract
Bidding

STA-1E Western Flow-Way Modifications - Imported Soil
Results
Less than $30,000,000 est. value
West Palm Beach, FL 33406

STA 1W Canal Crossing Underground Pipes
Results
$3,203,642 to $3,540,868 est. value
Glen Ridge, FL 33406

Last Updated 05/31/2021 01:06 AM
Project Title

Red Reef Park Snorkel Reef & North Jetty Maintenance Project

Physical Address View project details and contacts
City, State (County) Boca Raton, FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will Integrate 21 Additional Artificial Reef Modules to the Existing Snorkeling Reef Amenity to Form a Complete Snorkeling Trail. Each Module will be Constructed from Limestone Substrate in the Form of Nine Boulders of Three to Four-Foot Nominal Dimension. Modules will be Comprised of a Single Base Layer Consisting of Six Boulders, with Three Boulders Placed Tightly within the Void Spaces Above to Form The Second Layer.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings.
Division 09 - Finishes, Tiling.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Lockers.
Division 26 - Electrical, Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Access Control, Security Access Detection.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents