Similar Projects
Atkins High School Locker Room HVAC and ERV-4 Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Winston Salem, NC 27101

RFQ D/B - Mechanical Design Build Services for HVAC Upgrades to Carolina Theatre
Renovation
Sub-Bidding
$200,000 CJ est. value
Durham, NC 27701

Jet Bridges Pc Air And Gpus
Post-Bid
Greensboro, NC

Central Elementary School - HVAC, Electrical and Fire Alarm Upgrades
Post-Bid
Hillsborough, NC 27278

Administration Building AHU Replacement
Results
$276,915 est. value
Durham, NC 27701

Building 8 HVAC Equipment Replacement
Results
$70,000 to $75,000 est. value
Washington, NC 27889

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Broughton High School HVAC Upgrades
Renovation
Construction
$2,374,600 CJ est. value
Raleigh, NC 27605

Furnish, Deliver and Install a Chiller for the Conder Building
Renovation
Sub-Bidding
$200,000 CJ est. value
Hamlet, NC 28345

Parkwood Elementary HVAC Renovation
Term Contract
Post-Bid
Jacksonville, NC 28540

ECSU - Chiller Replacement
Results
Elizabeth City, NC 27909

Economizer Replacement and Installation - 22
Renovation
Sub-Bidding
$200,000 CJ est. value
Greensboro, NC 27412

Water Cooler Removal and Replacement
Alteration
Post-Bid
Tarboro, NC 27886

Replacement of HVAC Unit for USCG Base Elizabeth City Bldg 49
Results
Elizabeth City, NC

Construction Manager at Risk - HVAC Upgrades
Alteration
Post-Bid
Lenoir, NC

Last Updated 10/04/2022 03:04 PM
Project Title

Lenoir Community College HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Kinston, NC 28501   (Lenoir County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The full plan deposit will be returned to those bidders provided all documents are returned in good, usable condition within ten (10) days after the bid date. PDF sets only will be made available to all prime bidders at no cost provided they register with the Office of the Architect. All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities. The Contractor shall be issued a Notice to Proceed under this agreement on a date to be specified in a written order from the Designer and shall fully complete all work hereunder within 180 consecutive calendar for Base Bid days from said date. Additional days and conditions for days related to the acceptance of Alternate Bid items or Unit Prices are described in the Contract Documents. For each day in excess of the above number of days, the Contractor(s) shall pay to the Owner the sum of FIVE HUNDRED DOLLARS ($500.00) as liquidated damages reasonably estimated in advance to cover the losses to be incurred by the Owner by reason of failure of said Contractor(s) to complete the work within the time specified, such time being in the essence of this contract and material consideration thereof. The goals for participation by minority firms as subcontractors on this project have been set at 10%

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents