Similar Projects
Last Updated | 08/09/2019 10:06 AM |
Project Title | Jones Pier Residences Repairs for PA-04-FL-4283-PW-00796(0) |
Physical Address | View project details and contacts |
City, State (County) | Vero Beach, FL (Indian River County) |
Category(s) | Residential |
Sub-Category(s) | Single-Family Homes |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $100,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 7770 Jungle Trail 1. Remove cove ceiling mould, baseboards, doors and window casings and inside corner trims. 2. Remove all existing wood paneling 3. Install new prefinished wood paneling 4. Install new cove ceiling mould, baseboard, door and window casing and inside corner trims 5. Clean, prepare and paint all newly installed surfaces and existing surfaces where applicable. County to approve color prior to application. 6. Safe-off and replace all electrical wiring, connections, receptacles, and switches. 7. Replace all plumbing and fixtures as necessary with like items. County will approve fixtures prior to installation. 8. Clean all surfaces and remove all dust, debris and materials upon completion and prior to acceptance/inspection by the County. Front porch: 1. Remove baseboards and corner trims on wood paneling. 2. Remove existing wood paneling under windows on the north, south and west wall and install new prefinished wood paneling on the three walls. County to approve paneling finish prior to installation. 3. Install new baseboard and corner trim on new paneling. 4. Clean, prepare and paint all newly installed surfaces and existing surfaces where applicable. County to approve paint color prior to application. 5. Clean all surfaces and remove all dust, debris and materials upon completion and prior to acceptance/inspection by the County. 7790 Jungle Trail Master Bedroom/South Bedroom 1. Remove cove ceiling mould, baseboards, doors, window casing and inside corner trims. 2. Remove all existing wood paneling. 3. Install new prefinished wood paneling. County to approve paneling finish prior to installation. 4. Install new cove ceiling mould, baseboards, doors and window casings and inside corner trims. 5. Clean, prepare and paint all newly installed surfaces and existing surfaces where applicable. County to approve paint color prior to application. 6. Clean all surfaces and remove all dust, debris and materials upon completion and prior to acceptance/inspection by the County. Living Room 1. Patch all existing cracks in walls. 2. Remove wood ceiling battens and remove two water damaged wood ceiling panels, and install new wood ceiling panels and battens. 3. Replace and reset existing toilet new wax seal and bolts. 4. Replace water heater with 30 gal. electric tank type water heater with valves and repair all ancillary plumbing as necessary. 5. Safe-off and replace all electrical wiring, connections, receptacles, switches as required by Code. 6. Clean, prepare and paint all newly installed surfaces and existing surfaces where applicable. County to approve paint color prior to application. 7. Clean all surfaces and remove all dust, debris and materials upon completion and prior to acceptance/inspection by the County. | ||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |