Similar Projects
Paving Improvements for Ozark City Schools
Post-Bid
Ozark, AL 36360

Constructing the Planning, Resurfacing, Guardrail Installation, and Traffic Stripe on CR-36 from the junction of SR-105 in Ozark to the junction of SR-27
Infrastructure
Results
$1,578,973 to $1,929,856 est. value
Ozark, AL

Constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-85 from the Junction of SR-92 in Clayhatchee to the Intersection of SR-12 (US-84) in Daleville
Infrastructure
Results
$1,619,790 to $1,979,743 est. value
AL

RFP Design - Architectural Services for New Fire Station #10 and #3
New Construction, Infrastructure
Post-Bid
$570,000 CJ est. value
Dothan, AL 36301

Site Improvements & Walkway Canopy at Daleville Middle School
Results
Daleville, AL 36322

Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-134 from the Junction of SR-85 to the Junction of SR-123
Infrastructure
Results
$2,107,922 to $2,576,349 est. value
AL

Constructing the Planning, Resurfacing, and Traffic Stripe on CR-47 from the North City of Dothan to the junction of SR-134
Infrastructure
Results
$662,206 to $809,363 est. value
Pinckard, AL

Classroom Additions To Career Academy For The Dale County Board Of Education
Addition, Demolition, Infrastructure
Post-Bid
$700,000 CJ est. value
Ozark, AL 36360

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Street Resurfacing
Results
$259,915 est. value
Ozark, AL

Industrial Access Road Improvements
Infrastructure
Post-Bid
$192,000 to $210,000 est. value
Ariton, AL

Renovation / Addition for a Christian Learning Center at First Methodist Church
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$2,600,000 CJ est. value
Ozark, AL 36360

RFP D/B - Advanced Individual Training (AIT) Complex
New Construction, Infrastructure - 125,900 SF
Post-Bid
$100,000,000 CJ est. value
Fort Rucker, AL 36362

RFP D/B - Advanced Individual Training (AIT) Complex
New Construction, Infrastructure - 125,900 SF
Post-Bid
$100,000,000 CJ est. value
Fort Rucker, AL 36362

RFP D/B - Advanced Individual Training (AIT) Complex
New Construction, Infrastructure - 125,900 SF
Post-Bid
$100,000,000 CJ est. value
Fort Rucker, AL 36362

Last Updated 08/10/2022 05:31 AM
Project Title

Micro-Milling, Resurfacing, Access Management, and Traffic Stripe on SR-53 (US-231)

Physical Address View project details and contacts
City, State (County) Ozark, AL 36360   (Dale County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $3,972,960 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Dale Constructing the Micro-Milling, Resurfacing, Access Management, and Traffic Stripe on SR-53 (US-231) from the junction of SR-123 to the junction of SR-27 in Ozark. Length 4.321 mi. The Bracket Estimate on this project is from $3,375,409 to $4,125,500 . Contract Time: 105 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 019 - Micro-Milling, Resurfacing, Access Management, and Traffic Stripe on SR-53 (US-231) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earth Stripping and Stockpiling.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents