Similar Projects
Sewer Lift Station Pump Replacements at the Ambrosio Guillen Texas State Veterans Home
New Construction
Bidding
$100,000 est. value
El Paso, TX 79924

WWTP Master Lift Station Pump Replacement
Infrastructure
Bidding
$224,000 to $237,000 est. value
Commerce, TX

Lift Station & WWTP Repairs - Tropical Storm Harvey - Astor Street Lift Station
Post-Bid
Beaumont, TX 77701

West Portland Pump Station Improvements
Post-Bid
Portland, TX 78374

Rowlett Road Lift Station Upgrades
Results
$442,350 est. value
Rowlett, TX 75030

Lift Station C Replacement
Results
Porter Heights, TX

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

South College Avenue Stormwater Detention Facility Construction
Infrastructure
Pending Verification
$417,000 est. value
Bryan, TX

Upper East Fork Interceptor System Sloan Creek Lift Station
New Construction
Bidding
$9,000,000 est. value
Fairview, TX

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Sewer Lift Station
Term Contract
Results
Less than $637,000 est. value
Harlingen, TX 78552

Wastewater System Infrastructure Retrofit - Lift Station and Force Main Utilities
Infrastructure
Bidding
$5,800,000 to $6,000,000 est. value
Seabrook, TX

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

DCRRD Pump Station Upgrade Project 2020
Results
Carrollton, TX 75010

Lift Station No. 1 Rehabilitation
Renovation
Bidding
$200,000 to $225,000 est. value
TX

Last Updated 10/21/2021 03:08 PM
Project Title

Water System Improvements - Proposed Pump Station Number 5

Physical Address View project details and contacts
City, State (County) Gordon, TX   (Palo Pinto County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of furnishing and installing a hydro-pneumatic Pump Station No. 5 including a 30,000-gallon welded steel ground storage tank, a 3,000-gallon pressure tank, pumps, electrical, piping, valves, and other appurtenances. The project includes an alternative for an epoxy coated-bolted steel ground storage tank in lieu of a welded steel tank. The project also includes an additive alternative to furnish and install a chloramine disinfection system and appurtenances at this site

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents