Similar Projects
Harmon Street Reconstruction And Water Main Replacement
Bidding
Less than $1,500,000 est. value
Saint Clair Shores, MI

Meter Maintenance
Post-Bid
Clinton Township, MI

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

2019 30 Mile Water Main Extension
Results
MI

Lipke Road Water Main Replacement
Results
Less than $277,973 est. value
Clinton Township, MI

Water Pipe and Fittings and Hydrants
Post-Bid
Mount Clemens, MI 48043

Donald Avenue Water Main Replacement Stephens to Toepfer
Results
Less than $1,400,000 est. value
Eastpointe, MI

Water Meter Replacement Program
Term Contract
Post-Bid
Sterling Heights, MI

Clinton River WM Replacement - Water Main Replacement Project - Clinton River Road
Results
Less than $730,128 est. value
Clinton Township, MI

2020 DWRF Project –14 Mile Road Water Main and PRV’SDWRF Project No. 7425-01Andutica Road Water Main –13 Mile Road to 14 Mile Road
Results
Less than $6,200,000 est. value
Fraser, MI

DWRF Water Main Replacement and PRV Installation
Results
Fraser, MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Gate Valves
Results
Mount Clemens, MI

Beste Reconstruction and Water Main Replacement
Results
Saint Clair Shores, MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 08/10/2020 08:44 AM
Project Title

Marquardt Court Watermain Replacement Project

Physical Address View project details and contacts
City, State (County) New Baltimore, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work and approximate quantities are as follows: 8 Inch C909 DR 18 Water Main 753 FT Standard Hydrant 2 EA 8” Tapping Sleeve Valve in Well 1 EA Temporary Water Main Supply (if necessary) 1 LS Water Service Transfers 15 EA Together with traffic control, restoration and other related work items

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents