Similar Projects
Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bismark, Lafayette, and Plum Streets - Roadway Reconstruction and Resurfacing
Results
$425,500 est. value
Parkston, SD

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Paving and Overlay Project
Infrastructure
Post-Bid
Parkston, SD

Westward View Addition
Addition, Infrastructure
Results
Freeman, SD

Westward View Addition
Addition, Infrastructure
Results
Freeman, SD

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Asphalt Surface Treatment
Infrastructure
Results
$3,050,000 est. value

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Main Street and Railway Street Reconstruction
Infrastructure
Results
Freeman, SD

Main Street and Railway Street Reconstruction
Infrastructure
Results
Freeman, SD

Main Street and Railway Street Reconstruction
Infrastructure
Results
Freeman, SD

Spot Cold Milling and Spot Asphalt Concrete Resurfacing of Shoulders
Infrastructure
Results

Mill, AC Resurfacing
Infrastructure
Conception
$4,014,000 est. value
Olivet, SD 57052

Last Updated 08/18/2022 11:03 PM
Project Title

Cherry, 3rd, and Evergreen Streets

Physical Address View project details and contacts
City, State (County) Parkston, SD 57366   (Hutchinson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $420,159 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of roadway reconstruction and resurfacing, sidewalk installation, and storm sewer installation including approximately 350 ft. of concrete curb and gutter, 13,100 Sq. Ft. of concrete sidewalk, 240 Sq. Yd. concrete approach and driveway pavement, 1,180 Cu. Yds. of unclassified excavation, 1,008 Cu. Yds. of base course, 380 Tons of owner furnished base course, 880 tons of asphalt concrete composite, 333 ft. of storm sewer and corresponding miscellaneous construction items on Cherry St. west of 3rd St., 3rd St. from Cherry St. to Douglas St. and Evergreen Street west of 4th Street. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. No Pre-bid conference will be held. Bid security shall be furnished in accordance with the Instructions to Bidders.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents