Similar Projects
North County Elementary School - Palm Beach County
New Construction, Infrastructure
Conception
$29,885,542 CJ est. value
West Palm Beach, FL 33401

West Acreage Area Elementary School - Palm Beach County School
New Construction, Infrastructure
Conception
$29,885,542 CJ est. value
West Palm Beach, FL 33401

Tuttle Royale
New Construction, Infrastructure
Design
$279,600,000 CJ est. value
Royal Palm Beach, FL 33411

AutoZone #5999 / Wellington
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Village of Wellington, FL 33414

Heron Parkway Drainage Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Royal Palm Beach, FL 33411

RFP D/B - Column Abatement and Reconstruction, Paul G. Rogers Fed Bldg, W Palm Beach
Term Contract, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
West Palm Beach, FL 33401

CVS #7891 Parking Lot ADA Improvements / Lake Worth - Rebid
Infrastructure
Post-Bid
$100,000 CJ est. value
Lake Worth, FL 33467

BJ's Wholesale Club - West Executive Center Drive / West Palm Beach - Rebid
New Construction, Infrastructure - 103,596 SF
Post-Bid
$15,000,000 CJ est. value
West Palm Beach, FL 33401

Village Hall and Site Construction
New Construction, Infrastructure - 25,400 SF
Results
$12,894,392 est. value
Royal Palm Beach, FL

Unit 2C - Alton Neighborhood 5, Parcel G, Phase III Improvement Project
Infrastructure
Results
$2,865,622 est. value
Palm Beach Gardens, FL 33418

RFP Construction Manager at Risk - Sunset Palms Middle School 17- PP New Construction
New Construction, Infrastructure
Construction
$56,000,000 CJ est. value
Boynton Beach, FL 33472

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

Villages of Windsor
New Construction, Infrastructure
Pending Verification
$71,000,000 CJ est. value
Boynton Beach, FL 33426

Western Communities High School - Palm Beach County
New Construction, Infrastructure
Conception
$92,983,968 CJ est. value
West Palm Beach, FL 33401

Last Updated 10/26/2022 04:37 PM
Project Title

Deep Injection Well System - W23XX - Town of Jupiter

Physical Address View project details and contacts
City, State (County) Jupiter, FL 33458   (Palm Beach County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $22,551,933 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Since 1990, the Town's reverse osmosis (RO) concentrate management practice has been surface water discharge through an outfall to the Southwest Fork of the Loxahatchee River. Permitted by FDEP this disposal method is subject to water quality of the receiving water body (The River) and regulatory changes that determine permitting requirements. Although permittable in 1990, surface water discharges for disposal of concentrate are scrutinized and challenging to permit. The Town's permit includes stringent monitoring requirements and water qualtiy limitations at the concentrate outfall and at specified distances within the River. Permit renewal is required every five years. Though the Town has consistently met permit conditions, water quality impairments in the River may drive regulatory changes, precluding surface water discharge as the preferable long term method for concentrate management in the future. The most suitable long term alternative strategy for RO concentrate management, for the water plant, is construction of a Class I deep injection well (DIW) system, consisting of a DIW, pump station, and flexibilty for management of other water plant by-product and waste streams. As of October 25, 2022, this project is included in the Town of Jupiter FY 2023-2027 Budget CIP. An engineer has been selected for the project. Bidding is estimated to take place in February/March of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents