Similar Projects
137Th High Expansion Foam Testing
Term Contract
Post-Bid
Oklahoma City, OK 73159

Region 7 Elevator Inspection Contract
Demolition
Post-Bid

Preliminary Engineering, Site Plans and Inspection for Railroad Crossings
Term Contract
Results

Preliminary Engineering, Site Plans and Inspection for Railroad Crossings
Term Contract
Results

Pavement Rehabilitation)
Term Contract
Post-Bid

Grade, Drain, Bridge and Surface
Term Contract
Post-Bid

Construction Management Services
Term Contract
Post-Bid

Wetland and Stream Mitigation
Infrastructure
Post-Bid

Underwater Bridge Inspection
Infrastructure
Post-Bid

Ancillary Structure Safety Inspections
Infrastructure
Post-Bid

Manhole Inspection Program II
Term Contract
Post-Bid

Last Updated 08/18/2022 10:18 AM
Project Title

RFQ - Sanitary Sewer Evaluation Study and Capacity Analysis

Physical Address View project details and contacts
City, State (County) Choctaw, OK 73020   (Oklahoma County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $270,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Choctaw seeks Statement of Qualifications ( SOQ) from consultants to assess their wastewater collection system in an effort to reduce inflow and infiltration and hydraulically model sewer capacity. Assessment to include approximately 174, 000 LF of various sized sewer mains and approximately 700 manholes. It shall be the submitters responsibility to outline the intended methodology to be used for a complete and thorough assessment. Potential scope of methodology could include flow measurement, manhole inspection, smoke testing, dye flooding, cleaning, CCTV, sewer capacity hydraulic modeling and defect cost estimating. Submitter to include a similar example assessment report from another entity completed in the past including real and accurate data on percent of I& I reduction. The Method of Contractor Selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents