Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Sunburst Drive Reconstruction
Infrastructure
Design
Rapid City, SD 57702

Pavement Rehabilitation Project - Red Rock Canyon Road and Idlewild Court
Infrastructure
Design
Rapid City, SD 57702

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving Indefinite Delivery Indefinite Quantity (IDIQ)
Results
$2,000 to $2,500,000 est. value
Rapid City, SD

Saint Cloud Street Reconstruction - 5th Street to Highland Court
Infrastructure
Results
Rapid City, SD 57701

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Healing Sanctuary
LEED Certification, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hill City, SD 57745

Healing Sanctuary
LEED Certification, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hill City, SD 57745

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$28,834,000 CJ est. value
Rapid City, SD 57702

Replace Str Bridge, Approach Grading, PCC Surfacing, Concrete Barrier, Approach Slabs, Guardrail, Lighting
Demolition, New Construction, Infrastructure
Design
$6,636,000 CJ est. value
Rapid City, SD 57701

Army National Guard Correct Drainage/Replace Parking
Infrastructure
Post-Bid
Rapid City, SD 57701

Last Updated 06/01/2023 02:56 PM
Project Title

RFQ D/B - B21 Fuels Construction Contract

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57703   (Pennington County)
Category(s) Heavy and Highway, Sewer and Water, Transportation
Sub-Category(s) Aircraft Hangar, Paving/Reconstruction, Runways/Taxiways, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 1, 2023, information regarding award and award date has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: This upcoming solicitation will be a one-phase design-bid-build (DBB) RFP using trade-off source section procedures under the Best-value continuum. Pennington, South Dakota Construct a Fuel System Maintenance Dock using conventional design and construction methods. Construction will include the construction of a steel framed structure, concrete slab and foundation system, masonry block exterior walls, and standing seam metal roof. The project will include all necessary utilities, site improvements, pavements, communications support infrastructure, and all necessary supporting work for a complete and usable facility. As applicable, demolition includes Dock 80/Building 7244 (2,842 SM), the existing apron pavements (1,424 SM), sidewalks, and removing utilities to the nearest valve, manhole, or structure. The project will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with DoD antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. Estimate of the magnitude of this project is more than $50M - $100M. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

7,244 SF.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents