Similar Projects
Last Updated | 03/25/2023 08:04 PM |
Project Title | Platte River State Fish Hatchery Roofing Project |
Physical Address | View project details and contacts |
City, State (County) | Beulah, MI 49617 (Benzie County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $546,448 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | File No.751.22103.AGY Platte River State Fish Hatchery Roofing Project location- 15210 US Highway 31, Beulah, MI 49617 Furnish and install elastomeric sheet roofing system, including: 1. Roofing manufacturer's requirements for the specified warranty. 2. Removal of entire existing roof membrane and flashings. 3. Removal of all existing insulation down to the deck. 4. Preparation of new roofing substrates. 5. Wood nailers for roofing attachment. 6. Tapered Insulation. 7. Elastomeric membrane roofing. 8. Metal roof edging and copings. 9. Flashings. 10. Other roofing-related items specified or indicated on the drawings or otherwise necessary to provide a complete weatherproof roofing system. DESCRIPTION OF WORK: Work involves removal and replacement of three membrane roofs and all associated appurtenances. All removed materials must be properly disposed of. Building Construction, Industrial (Warehouse, Etc.) ACCEPTING QUESTIONS UNTIL: January 16, 2023 @ 5 PM EST. DESCRIPTION OF WORK: Work involves removal and replacement of three membrane roofs and all associated appurtenances. All removed materials must be properly disposed of. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed 5% Bid Security: Required |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |