Similar Projects
Installation of Automatic Transfer Switches, Docking Stations
Renovation
Sub-Bidding
$250,000 CJ est. value
Costa Mesa, CA 92626

Switched Ethernet School Site Circuit Connectivity Services - E-rate - 2023
Term Contract
Sub-Bidding
Costa Mesa, CA 92626

Overhead Electric System Improvement - City of Anaheim
Alteration
Post-Bid
Anaheim, CA 92805

Plant 2 Distribution Center H 480V Switchgear Under-Voltage Relays Upgrade
Alteration
Post-Bid
Fountain Valley, CA

FMS Paving and Lighting
Infrastructure, Alteration
Results
$1,500,000 est. value
Los Alamitos, CA 90720

Fullerton College Swing Space
Renovation, Alteration
Results
$420,000 est. value
Fullerton, CA 92832

Bristol Street and Santa Clara Avenue Traffic Signal Modification
Infrastructure
Sub-Bidding
$360,000 CJ est. value
Santa Ana, CA 92706

Generator Maintenance and Repairs
Term Contract
Post-Bid
Sacramento, Vina, CA 95811

Senior Center Generator
Term Contract
Results
$170,000 est. value
Brea, CA 92821

Traffic Signals Maintenance and Emergency on-call Services
Term Contract
Sub-Bidding
Anaheim, CA 92805

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

WRP Sluice Gate Replacement Project
Infrastructure
Results
$70,000 est. value
San Clemente, CA 92673

E-rate Switching Equipment
Term Contract
Sub-Bidding
Orange, CA 92866

Secondary Treatment VFD Replacements at Plant No. 2
Infrastructure, Alteration
Post-Bid
$1,632,000 est. value
Fountain Valley, Huntington Beach, CA 92646

Luminaires, Cross Arms, Fuses, and Electrical Materials
Alteration
Results
Anaheim, CA 92805

Last Updated 01/10/2023 11:31 AM
Project Title

Montwood Park Lighting Project FY 22-23

Physical Address View project details and contacts
City, State (County) La Habra Heights, CA 90631   (Orange County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $159,831 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises the furnishing of all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of but not be limited to installation of above and underground conduit, pull boxes, lighting poles, electrical conductors and all associated work as identified on the Plans, and Specifications, in the City of La Habra. All work shall be completed within Twenty (20) working days from the start date specified in the Notice to Proceed. A Notice to Procure shall be issued for materials with long lead time with time limit of 120 calendar days.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents