Similar Projects
Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Refurbish Marley Cooling Tower
Alteration
Post-Bid
Madison, WI 53704

Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Results
$1,247,800 est. value
Madison, WI 53704

HVAC Replacement
Alteration
Results
$931,000 est. value
Madison, WI 53704

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Valve Boxes
Term Contract
Post-Bid
Madison, WI

Ventilation Repairs
Alteration
Results
$210,000 est. value
Madison, WI 53705

Air Filtration Installation
Alteration
Post-Bid
$133,000 est. value
Sun Prairie, WI

2022 Library Rooftop Unit Replacement
Alteration
Results
Monona, WI

Cottage 7 HVAC Air Compressor Maintenace and Repair Services
Alteration
Post-Bid
Madison, WI

Environmental Health and Safety Central Utility Connections - GPC
Alteration
Results
$1,350,000 est. value
Madison, WI 53715

Removal and Replacement of Air Conditioning Units
Alteration
Post-Bid
Madison, WI 53704

Environmental Health and Safety Central Utility Connections - MEP
Alteration
Results
$1,350,000 est. value
Madison, WI 53715

Heat Pump Replacements
Alteration
Post-Bid
$623,000 est. value
Sun Prairie, WI 53590

Building One And Four Air Conditioning Installation MEP
Infrastructure
Results
Madison, WI 53704

Last Updated 04/28/2023 07:33 AM
Project Title

Chilled Water Coil Replacement

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $34,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the chilled water coil in the air handling unit servicing Goodland Hall West C Wing at MMHI. Question Deadline 03/22/2023 at 4:30 PM CT All communication and/or questions on all matters regarding this Bid must be made in writing directed to the DHS Procurement Manager: Annette Bender at annette.bender@dhs.wisconsin.gov Bidder must replace chilled water coil in the air handling unit. o Bidder must provide all labor for replacement/installation. o Bidder must provide any rigging required. o Bidder must provide any crane equipment required. o Bidder must do start-up and testing of the new coil. o Bidder must dispose of old coil. o Bidder must replace any insulation disturbed by the replacement. o Bidder must provide an estimated lead time from date of order. o Bidder must provide manufacturer/workmanship warranty on the replacement coil.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents