Similar Projects
4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Greenbrier Boulevard Water Main Replacement
Results
Less than $200,000 est. value
Pensacola, FL 32514

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Miscellaneous Valve Replacement Project 2021
Results
Less than $325,000 est. value
Pensacola, FL

Scenic Hills Country Club Water Main Replacement-Phase-1
Infrastructure
Results
$750,000 est. value
Pensacola, FL 32514

PW-PB - Water Access Structures
Infrastructure
Post-Bid
Gulf Breeze, Pensacola Beach, FL 32561

Thousand Oaks - Springmier Place Pipe Repairs (FEMA)
Infrastructure
Results
Pensacola, FL

Annual Service Contract for Utility Construction
Term Contract
Results
Pensacola, FL

East Hill Water Main Upgrade Phase -1
Infrastructure
Results
Pensacola, FL 32503

Fire Hydrants and Extensions
Infrastructure
Results
Pensacola, FL

Backflow Testing at Parks
Infrastructure
Post-Bid
Pensacola, FL

9th Avenue at Carpenter's Creek Utility Relocation 2021
Infrastructure
Results
$200,000 est. value
Pensacola, FL

North 46th Avenue Water Main Replacement
Infrastructure
Results
$1,000,000 est. value
West Pensacola, FL 32506

Doris Avenue, Powell Street, Rose Avenue and Figland Avenue Water Main Upgrades
Infrastructure
Results
$800,000 est. value
Ensley, FL 32534

Sorrento-Bauer Water Main Relocation
Infrastructure
Results
$220,000 est. value
Pensacola, FL

Reported 05/05/2022 12:00 AM
Project Title

Replace Deteriorated Fire Hydrants Fort Pickens

Physical Address View project details and contacts
City, State (County) Pensacola Beach, FL 32561   (Escambia County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The National Park Service, Southeast Region, West Major Acquisition Buying Office, has a requirement for a minor construction contract for replacement of six (6) deteriorated Fire Hydrants, Gate Valves and associated components: BASE BID: Housing area, two (2) fire hydrants (# 1 and # 3) Building 5 area, one (1) fire hydrant (# 2) Campground Store area, one (1) fire hydrant (# 5) and Ranger Station/Campground Registration area, two (2) fire hydrant (# 6 and # 7). BID ADDITIVE: Fort Pickens Water System, one (1) fire hydrant (# 4)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents