Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Lehi Brownstones
New Construction - 9,100 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lehi, UT 84043

RFP Construction Manager - Eagle Mountain Boulevard Widening (CMGC)
Infrastructure
Post-Bid
$9,034,845 CJ est. value
Eagle Mountain, UT 84043

Foothill Boulevard Extension - Lariat to Pony Express Parkway
Infrastructure
Results
$17,036,199 CJ est. value
Saratoga Springs, UT 84045

RFQ Contractor - 2021 UDOT Tie Fork Rest Area Landscaping Upgrades
Infrastructure
Results
$192,640 CJ est. value
Spanish Fork, UT 84660

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

The Lofts at Holbrook Farms
New Construction
Pending Verification
Lehi, UT 84045

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Lehi Power Excavation Contract
Term Contract, Infrastructure
Post-Bid
Lehi, UT

Last Updated 06/07/2023 08:37 AM
Project Title

East Center Street Townhomes

Physical Address View project details and contacts
City, State (County) Spanish Fork, UT 84660   (Utah County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of townhomes. As of June 7, 2023, no applications have been submitted for building permits. This project has obtained conditional zone change approval. Information regarding the selection of a general contractor has not been released. Although a firm timeline cannot currently be established, construction is not expected to commence prior to third quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents