Similar Projects
Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Market Survey - Modernize and Upgrade Laredo (LDR) ATCT
Bidding
Laredo, TX

Corpus Christi International Airport (CCIA) Improve Terminal Building Passenger Boarding Bridges
Bidding
Corpus Christi, TX 78406

Annual Request for Qualifications for future airport-related planning and development projects
Term Contract
Post-Bid

Annual Request for Qualifications for future airport-related planning and development projects
Term Contract
Post-Bid

Airport Improvements
Results
Vernon, TX 76384

Terminal D Board Owned Passenger Boarding Bridge Rehabilitation
Renovation
Results
$4,254,000 est. value
Dallas, TX

American Airlines DFW Central Fulfillment Center
New Construction - 394,000 SF
Construction
$10,000,000 CJ est. value
Dallas, TX 75261

FBO Terminal Mckinney National Airport
Renovation
Construction
McKinney, TX 75069

Goldthwaite Municipal Airport
Bidding
Goldthwaite, TX 76844

Terminal A Renovations Phase III, Front Door Modernization
Renovation
Post-Bid
Less than $4,200,000 est. value
San Antonio, TX 78205

New Airport Terminal Building – Refugio County
Results
Less than $381,749 est. value
Refugio, TX 78377

Baggage Handling Systems Operations and Maintenance Services
Post-Bid
Houston, TX 77251

Terminals A & B Departure Area Paver Replacement and Approach Slab Repairs
Results
Houston, TX 77000

Cameron Municipal Airpark
Post-Bid
Cameron, TX 76520

Reported 12/17/2020 12:00 AM
Project Title

Valley International Airport FAA Airways Tech Ops Facilities

Physical Address View project details and contacts
City, State (County) Harlingen, TX 78550   (Cameron County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

General contractors for renovations to an existing building to become FAA Airways Tech Ops Facilities.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents