Similar Projects
7th Street Parking Lot Construction
Infrastructure
Bidding
Haines City, FL

A Street Revitalization Phase I from Garden Street to Cervantes Street
Infrastructure
Bidding
Pensacola, FL

Annual Concrete Sidewalk, Driveway, Curb, and Gutter Repairs
Term Contract
Post-Bid
Fort Myers, FL 33901

Concrete, Brick and Mortar Repair and Replacement
Term Contract
Post-Bid
Saint Pete Beach, FL 33706

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

Dominos # 5082-2
Alteration
Construction
Plantation, FL 33324

Construction Services for Simpson Road Widening Phase I Project
Infrastructure
Bidding
Kissimmee, FL 34746

Saratoga Apartments Outer Parking Lots Renovations
Post-Bid
Saint Petersburg, FL 33713

4th Avenue Sidewalk - JSEB Set-Aside
Results
Jacksonville, FL 32202

Resurface Fellsmere Grade Recreational Area Parking Lot
Infrastructure
Bidding
$150,000 est. value
Palm Bay, FL 32909

Citywide Sidewalk Repair Services
Term Contract
Post-Bid
Less than $200,000 est. value
North Miami, FL

Zerbe Street-Calhoun Avenue Pedestrian Improvements
Results
Less than $683,677 est. value
Destin, FL 32541

Manor Lane Pedestrian Improvements
Infrastructure
Bidding
South Miami, FL 33143

Brentwood Park, Installation of ADA Compliant Concrete Path
Post-Bid
Jacksonville, FL 32206

Last Updated 02/22/2022 07:23 AM
Project Title

Walton Road Sidewalk and Asphalt Path

Physical Address View project details and contacts
City, State (County) Defuniak Springs, FL 32433   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a new 5ft. wide sidewalk along the south side of Walton Road with new crosswalk striping and signage. The project also includes the construction of a new 8 ft. wide asphalt path along the north side of Walton Road from Wee Care Park to State Road 83. New storm sewer will also be constructed along the north side of Walton Road along the new asphalt path at the Tom Thumb gas station

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents