Similar Projects
Upgrade Force Protection and Emergency Power, Test Sites
Design
$500,000 to $1,000,000 est. value
Munnsville, Newport, NY 13416

Town Building Updates and Repairs - Electrical Construction
Term Contract, Renovation
Design
$400,000 CJ est. value
Scipio Center, NY 13147

Infrastructure Improvements, North Campus Phase 2 - Electrical Upgrades
Renovation
Bidding
$10,000,000 CJ est. value
Albany, NY 12207

Regional Signal Requirements SFY 23/24
Infrastructure
Sub-Bidding
$1,250,000 CJ est. value
Little Valley, NY 14755

Otselic Valley Central School District 2023/24 Capital Outlay Project
Renovation
Sub-Bidding
$100,000 CJ est. value
South Otselic, NY 13155

2022 Generator Maintenance Contract
Term Contract
Post-Bid
Delmar, NY

LED Price Signs Fabrication & Installation - NY, NJ, & PA
Term Contract, Alteration
Post-Bid

Provide Bar Screen, Building 23 - Electrical
Alteration
Results
$25,000 to $50,000 est. value
Moravia, NY 13118

Generator Maintenance and Repair
Term Contract
Results
NY

Rehabilitate Office and Building Entrance - Electrical
Renovation, Infrastructure
Construction
$261,000 CJ est. value
Latham, NY 12110

Jamestown Public Schools Capital Improvement Project Phase 1 - Bus Garage, Milton J. Fletcher Elementary School & Raymond J. Fashano Technical Academy - BP-06 Electrical
Renovation
Construction
$300,000 CJ est. value
Jamestown, NY 14701

Generator Installation
Alteration
Post-Bid
Schuyler Falls, NY 12985

Cincinnatus CSD 2021-2022 Capital Outlay Project
Alteration
Results
$85,000 est. value
Cincinnatus, NY

Andover CSD 2017 CIP - Phase III - Electrical Construction
Renovation
Construction
$33,200 CJ est. value
Andover, NY 14806

Electrical Repairs
Alteration
Post-Bid
Albany, NY

Last Updated 07/24/2023 04:33 AM
Project Title

New Maintenance Building

Physical Address View project details and contacts
City, State (County) Celoron, NY 14720   (Chautauqua County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,113,321 [brand] Estimate
Plans Available from Copy Center - 11/15/22
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor, materials, equipment and services for the complete installation of motor control wiring and temperature control wiring as required in Contract Documents. Provide wiring and conduit, required to connect devices furnished as part of or adjunctive to the automatic temperature control system and for motor control, regardless of the source of supply. Control wiring includes 120 volt and lower voltage wiring for control signals directing equipment operation. Control circuits shall be 120 volt maximum. Provide wiring in accordance with requirements specified in Division 26, Electrical and the National Electrical Code. Provide devices required for proper system operation, including special electrical switches, transformers, disconnect switches, relays, and circuit breakers protection. Each bid must be accompanied by a bid bond or certified check in the amount of five percent (5%) of the amount of the bid, duly executed by the bidder as principal, and having as surety thereon a surety company approved by the owner. Performance bond and payment bond equal to 100% of the contract sum are required to be delivered at time contract is signed with owner. No bidder may withdraw their bid within sixty (60) days of the date of the bid opening. The village of celoron reserves the right to waive any inconsistencies and to reject any or all bids. Bid Result. General Construction - Kinley Corp - $793000 Mechanical Construction - Citadel Services, Inc. - $137507 Electrical Construction - Ahlstrom Schaeffer Electric Corp. - $80250 Plumbing Construction - Ciancio Mechanical - $102564

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents