Similar Projects
Last Updated | 10/02/2023 05:31 AM |
Project Title | MUSC Mechanical Room Expansion Chiller #1 and Controls Replacement |
Physical Address | View project details and contacts |
City, State (County) | Charleston, SC 29425 (Charleston County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,200,000 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace existing 1250 ton water-cooled chiller along with existing chilled water and condenser water isolation valves. Scope includes pipe connections, electrical, automatic temperature controls Bid Security is Required in an Amount Not Less Than 5% of the Base Bid. Performance and Labor & Material Payment Bonds: the Successful Contractor Will Be Required to Provide Performance and Labor and Material Payment Bonds, Each in the Amount of 100% of the Contract Price. Construction cost range : 1,100,000 - 1,200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions & correspondence concerning this Invitation shall be addressed to the A/E. A/E NAME: RMF Engineering, Inc, A/E CONTACT: Michael Scruggs, PE EMAIL: michael.scruggs@rmf.com TELEPHONE: (843) 683-6753 Replace existing 1250 ton water-cooled chiller along with existing chilled water and condenser water isolation valves. Scope includes pipe connections, electrical, automatic temperature controls and other Work indicated in the Contract Documents |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |