Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Infrastructure
Conception
$440,000 CJ est. value
Davenport, IA 52807

Wayfind Sign Project
Infrastructure
Design
Davenport, IA 52801

PCC Patching
Infrastructure
Bidding
$750,000 CJ est. value
Davenport, IA 52806

PCC Patching
Infrastructure
Bidding
$750,000 CJ est. value
Davenport, IA 52806

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Main Street Landing - Destination Play Area and Event Lawn
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Davenport, IA 52803

Wisconsin & 35th Street Improvements – HMA Surfacing And Trail
Infrastructure
Results
Le Claire, IA

CDBG Group 2 - Reconstruction East 7th Street (Iowa to LeClaire) and LeClaire Street (6th-8th)
Infrastructure
Results
Davenport, IA 52803

Juvenile Detention Development
New Construction
Pending Verification
$16,000,000 to $18,000,000 est. value
Davenport, IA

New Juvenile Detention Center - Scott County
Demolition, New Construction, Infrastructure
Pending Verification
$21,750,000 CJ est. value
Davenport, IA 52803

Adler Theatre Plaster/Paint Repair - FP085 - City of Davenport
Infrastructure
Conception
$975,000 CJ est. value
Davenport, IA 52801

PCC Patching
Infrastructure
Bidding
$500,000 CJ est. value
Davenport, IA 52806

Fairmount Community Center
New Construction, Infrastructure - 30,000 SF
Post-Bid
$2,200,000 CJ est. value
Davenport, IA 52804

31st and 32nd Street Speed Hump
Infrastructure
Results
Davenport, IA

Last Updated 02/13/2023 09:42 AM
Project Title

New Youth Justice & Rehabilitation Center

Physical Address View project details and contacts
City, State (County) Davenport, IA 52807   (Scott County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Paving/Reconstruction, Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $22,200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: The construction of a new 64,000 SF one-story, standalone detention building with a two story administrative area. Work for this project includes earthwork, utilities, landscaping, fencing, asphalt paving, site and building concrete, masonry, structural steel, manufactured wall panels, carpentry, casework, weatherproofing, roofing, sealants, doors, frames, hardware, detention grade materials and accessories, aluminum entrances, storefronts and curtainwalls, gypsum wall systems, tile, carpet, resilient flooring, painting, acoustical ceilings, plumbing, HVAC systems, fire protection systems, temperature control, security systems, and electrical systems.

Details

2 Stories Above Grade, 64,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting and Coating, Painting, High-Performance Coatings, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Unit Kitchens, Foodservice Equipment.
Division 12 - Furnishings, Countertops, Rugs and Mats, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire-Extinguishing Systems, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Audio-Video Communications Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents