Similar Projects
Plumbing Maintenance and Installation
Alteration
Post-Bid
Berryville, AR

Bodcaw Low and Moderate Income (LMI) Plumbing Hookup Project
Alteration
Post-Bid
$100,000 est. value
Bodcaw, AR

IDIQ General Maintenance at Pine Bluff Site Office
Term Contract
Results
Pine Bluff, AR 71601

Sub-Basin S004 Sewer Main Realignment, Rogers Avenue - Waldron to 56th Street
Infrastructure
Results
$1,256,295 CJ est. value
Fort Smith, AR 72903

Campus Wide Water Fountain Replacement - Bid Package 1 Plumbing
Alteration
Post-Bid
$255,000 est. value
Jonesboro, AR

Wastewater System Improvements - Rebid
Renovation
Results
$3,225,910 CJ est. value
Lake City, AR 72437

Thibault Road Relocation
Infrastructure
Post-Bid
$300,000 CJ est. value
Little Rock, AR 72206

Highway 49 and North Oak Street Sewer Extension
Infrastructure
Results
$460,829 CJ est. value
Brookland, AR 72417

Pipe, Fittings, and Valves
Term Contract
Post-Bid
Paragould, AR 72450

8-Inch Waterline Replacement
Infrastructure
Results
$130,250 CJ est. value
Waldron, AR 72958

Sandy Beach Bathroom Improvements - Material Package - Plumbing
Term Contract
Post-Bid
Heber Springs, AR 72543

Wastewater Collection System Improvements Phase I - Lift Station and Force Main
Demolition, New Construction, Infrastructure
Results
$6,944,410 CJ est. value
Elkins, AR 72727

Hot Water Heater Replacement for 170 Dwelling Units
Renovation
Post-Bid
$400,000 CJ est. value
Springdale, AR 72764

MASTER METER GUY WATER WORKS
Infrastructure
Results
$238,250 CJ est. value
Guy, AR 72058

2" Galvanized Water Main Replacements Little Rock Phase 2 2023
Infrastructure
Post-Bid
$2,175,000 CJ est. value
Little Rock, AR 72201

Last Updated 09/14/2023 06:03 PM
Project Title

Highway 278 / Highway 65 Water Line Relocation

Physical Address View project details and contacts
City, State (County) Tillar, AR 71670   (Desha County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $533,687 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consisting of installing approximately 14,000 LF of water main and associated valves, fittings, encasement and service connections, and abandoning relocated water main at three sites east of Selma along proposed Route 69. Addendums to the bid package will be issued through the Harbor online Plan Holders List; there, all prime bidders shall be responsible for downloading the bid documents from the Harbor online plan room in order to be included in the Plan Holders list. Bidders must enter the addenda numbers on the Bid Form to verify receipt. There will be no refund for returned Contract Documents. The Owner reserves the right to waive any informality or to reject any or all bids. Bidders may not withdraw their bids within 60 days after the date of bid opening and must provide bid bonds as required. All bidding processes shall be in accordance with State law.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents