Similar Projects
Woodson Village Rehabilation
Results
$5,055,913 est. value
College Station, TX 77842

Fleet Upgrades - Oil Pit and Storm Drain
Infrastructure
Bidding
$165,000 est. value
College Station, TX 77840

Water, Sewer, Drainage and Paving Improvements for Southern Pointe Subdivision - Section 201
Infrastructure
Results
TX

CSU Northgate Manhole & Conduit Installation
Infrastructure, Alteration
Results
College Station, TX 77842

Southside Safety Improvements Projects
Results
College Station, TX 77840

Midtown Reserve Subdivision Phase 107
Post-Bid
College Station, TX

Rock Prairie Management District No. 2 Midtown City Center Phase 301
Results
College Station, TX 77840

Medical District Sewer Interceptor Phases II and III
Results
$4,456,250 est. value
College Station, TX

Southern Pointe Section 101
Results
College Station, TX 77845

Independence Avenue Sanitary Sewer Relocation
Results
Less than $550,000 est. value
Bryan, TX 77803

East Side Sewer Service
Results
Less than $2,000,000 est. value
Bryan, TX 77803

Rock Prairie Management District No. 2 Midtown Reserve Subdivision Phase 105
Results
College Station, TX 77840

Midtown Reserve Subdivision Phase 106
Post-Bid
College Station, TX 77840

Water, Sanitary, Drainage and Paving Facilities for Southern Pointe Section 200
Results
TX

Installation of Septic Systems
Results
College Station, TX 77843

Last Updated 07/20/2021 12:18 PM
Project Title

CTE Complex Sewer Service

Physical Address View project details and contacts
City, State (County) Bryan, TX 77807   (Brazos County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the construction of approximately 1,100 LF of proposed SDR-26 PV sanitary sewer pipe, 2 (two) proposed tie-ins to the existing CTE Complex Facility, 6 (six) proposed cleanouts and 1 (one) proposed public sanitary sewer connection that requires the contractor to core into with a boot and install an internal drop per Bryan-College Station standard specs. The scope also includes the removal and capping of all on-site existing septic facilities per code, temporary construction fence, and removing/replacing an existing gravel road where the proposed service crosses.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents