Similar Projects
PMAA, RMSB, Willow Creek Winter Bridge, SB2001
Addition
Bidding
Denver, CO

2020 Road 7 Bridge Replacement Project
Post-Bid
CO

Pedestrian Bridge Repairs
Post-Bid
Aurora, CO 80012

6530 Road Bridge Deck Replacement Project
Results
Less than $408,325 est. value
Montrose, CO

Jolly Road Bridge Over First Creek & Bridge & Guardrail Improvement
Results
CO

Pedestrian Bridge and Abutment Landing
Post-Bid
Colorado Springs, CO

Bear River Bridge Replacement
Results
Less than $303,159 est. value
Steamboat Springs, CO 80487

Rio Blanco County Bridge Maintenance
Post-Bid
Meeker, CO 81641

Y--SJCP OSO Bridge and Culverts
Results
$1,000,000 to $5,000,000 est. value
CO

2021 Wildin Bridge Repair and Decking Replacement
Post-Bid
Aspen, CO 81611

14th Avenue Bridge Replacement Over Cherry Creek and Cherry Creek Trail
Results
$4,100,000 to $4,500,000 est. value
Denver, CO

MESA-58-M.6 Bridge Replacement Project
Post-Bid
Grand Junction, CO 81502

Bridge Inspection, Maintenance, Repair and Replacement
Term Contract
Results
Fort Collins, CO 80522

Paseo Bridge Replacement and Trail Improvements Project
Post-Bid
Colorado Springs, CO 80903

Raton Pass Bridge Rehabilitation using Fiber Reinforced Polymer Wrap and Epoxy Injections into Cracks
Results
Less than $1,000,000 est. value
CO

Last Updated 10/20/2021 07:11 AM
Project Title

Arapahoe Road - Big Dry Creek Bridge Replacement

Physical Address View project details and contacts
City, State (County) Centennial, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,085,062
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of removal and disposal of trash of any kind within the limits of the right of way, easement areas, and other areas shown in the contract or required by the work. This work also consists of removal of existing sod to the limits shown on the plans. These items shall be removed and disposed of by the Contractor during construction and prior to final acceptance of the project.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents