Similar Projects
The Firs At Talus
New Construction, Infrastructure
Conception
Issaquah, WA 98027

Brightwater Aeration Basin Optimization
Infrastructure
Design
$5,500,000 est. value
WA

Lake Hills and NW Lake Sammamish Interceptor Upgrade
Infrastructure
Design
$70,000,000 est. value
WA

Sunset Playfield Soil Remediation
Infrastructure
Bidding
$1,012,206 est. value
Seattle, WA 98168

Fall City Floodplain Restoration Project
Infrastructure
Post-Bid
$9,715,074 est. value
Fall City, WA 98024

Sammamish River Cis
Alteration
Post-Bid
$1,200,000 est. value
WA

South Renton Transit Center Remediation Project
Infrastructure
Results
$3,300,000 est. value
Renton, WA 98057

Herzman Levee Setback Construction
Infrastructure
Design
$4,200,000 est. value
WA

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Mitigation Fairwood - 4 Phase - 2 Molasses Creek
Infrastructure
Design
WA

Quillayute River Restoration
Term Contract
Post-Bid

Lake Hills Interceptor Phase II
Alteration
Design
$13,330,000 est. value
WA

Fountain Ilse D91126
Infrastructure
Design
$300,000 est. value
WA

Madsen Dam DR0642
Infrastructure
Design
$300,000 est. value
WA

Brps Seismic Upgrades
Infrastructure
Design
$14,000,000 est. value
WA

Reported 05/19/2022 12:00 AM
Project Title

Environmental Remediation Construction - Unit Priced Contract 2

Physical Address View project details and contacts
City, State (County) Seattle, WA   (King County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value Less than $2,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Contract entails remediation of City Light properties that have been characterized to have contaminants present at concentrations exceeding regulatory thresholds. Typical contaminants include pesticides, metals, hydrocarbons and PCBs. The bulk of the required remediation work includes excavation and transportation of contaminated soils or materials. Some locations may require soil removal via air knife/ vactor methods for preservation of large vegetation and trees or adjacent structures/facilities. Other work will include site preparation, erosion and stormwater control, traffic control, hauling and disposal, backfill and site restoration.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents