Similar Projects
The Adirondack / Glens Falls T
Conception
Chester, NY

LiDestri Conveyor Bridge System & Tank Farm Expansion
New Construction
Design
Rochester, NY 14606

Port`s Wind Energy Expansion
New Construction, Infrastructure - 626,014 SF
Bidding
Albany, NY

Tioga County Bridge Maintenance Project Phase VIII
Renovation
Bidding
NY

Brutus Trail Bridge "C"
Post-Bid
Auburn, NY 13021

Rehabilitation of Mud Mills Road Bridge Over Ganargua Creek
Post-Bid
Newark, NY

Rehabilitation of Slayton Settlement Road Bridge (BIN 3329570) Over East Branch Eighteen Mile Creek
Results
$1,250,000 to $1,500,000 est. value
Wilson, NY

Replacement of Washington Drive Bridge Over Fuller Hollow Creek
Term Contract
Results
Vestal, NY 13850

Replacement of CR 28 (Townline Road) Bridge over Trout River
Post-Bid
Constable, NY 12953

Bridge Rehab: Four Bridges in City of Yonkers
Results
Less than $27,100,000 est. value
Bronxville, Elmsford, Greenburgh, Mount Pleasant, Scarsdale, Yonkers, NY 10583

Camp 6 and Gypsy Bridges
Post-Bid
Salamanca, NY

Replacement of Bolivar Road Bridge Over Chittenango Creek
Results
Less than $900,000 est. value
Chittenango, NY 13037

Redwater Brook Bridge Reconstruction
Post-Bid
Brasher Falls, NY

Upton Road Bridge Replacement over Bowen Creek
Results
Batavia, NY 14020

Bridge Painting and Steel Repairs of Leydecker Road Bridge (BIN 3328840) over Cazenovia Creek
Post-Bid
West Seneca, NY

Last Updated 03/31/2022 12:43 PM
Project Title

Construction Management Services for New Bridge Over the Rail Corridor

Physical Address View project details and contacts
City, State (County) NY   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Hudson Valley District of the New York State Office of Parks, Recreation, and Historic Preservation (OPRHP) seeks proposals for Construction Management services related to the construction of a new bridge over the rail corridor as part of the proposed Hudson Fjord Trail Development within Hudson Highlands State Park. The Breakneck Bridge Project is located in the Town of Fishkill, Dutchess County, NY along a half-mile portion of State Route 9D just north of the Route 9D vehicular tunnel and adjacent to and across the Metro North Railroad (MNR) tracks and adjacent to Hudson Highlands State Park Preserve (Preserve). Summary Project Description: The project involves construction of a new bridge over the Metro-North rail corridor to carry the proposed Hudson Fjord trail along the Hudson River between Cold Spring and Beacon, New York. The project will consist of one lump sum contract, to be coordinated by the construction manager selected via. this RFQ process.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents