Similar Projects
Last Updated | 12/28/2023 09:35 AM |
Project Title | Mt. Tabor Vtry(35) (Re-Ad) and Wallingford Vtry(39) (Re-Ad) |
Physical Address | View project details and contacts |
City, State (County) | Mount Tabor, VT 05739 (Rutland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected February 2024 |
Bids Due | View project details and contacts |
Estimated Value | $4,707,359 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location: Mt. Tabor Vtry(35)(Re-Ad) - Vtr Bridge No. 83 Over Mill Brook at Mile Post 36.35 in Mount Tabor. Wallingford Vtry(39)(Re-Ad) - Vtry Bridge No. 88 Over Otter Creek Type of Construction: Mt. Tabor Vtry(35) (Re-ad) - Rehabilitation of Existing Structure by Strengthening Interior Floor Beams Removal and Replacement of Timber Pedestals and Concrete Backwalls, Bridge Seats and Wingwalls With Precast Concrete. Reconstruction of Approaches. Wallingford Vtry(39) (Re-ad) - Bearing Replacement; Replacement of Abutment and Pier Bearing Seats; Replacement of Abutment Backwalls; Rivet Replacement; Install Retaining Structure Bid Bond: Electronic bid bond to be submitted in the amount of 5% of the Contractor's bid. For this proposal the Engineer's Estimate is Category E $2,500,000 - $5,000,000 All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the Contractor's Experience Questionnaire and Financial Statement And Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form During the advertisement period, all questions shall be addressed solely to the Office of Contract Administration via email: AOT.ConstructionContractingInquiry@vermont.gov. All inquiries must be received by 4:30pm on Wednesday, December 06, 2023.. This Contract shall be completed on or before May 23, 2025 The right is reserved to reject any or all bids, to waive any formality, and any and all technicalities in bids, and to accept such bids as may be deemed in the best interest of the awarding agency. VT DOT - Mt. Tabor Vtry(35) (Re-Ad) and Wallingford Vtry(39) (Re-Ad) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |