Similar Projects
EMS Headquarters - Archimages
New Construction, Infrastructure
Design
$12,300,000 CJ est. value
Manhattan, KS 66502

College Heights Waterline Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Manhattan, KS 66502

College Heights Waterline Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Manhattan, KS 66502

Bus Shelter Project
New Construction, Infrastructure
Post-Bid
Manhattan, KS

Asphalt Overlay Improvements
Infrastructure
Post-Bid
$500,000 est. value
Randolph, KS

2021 Asphalt Street Maintenance Phase I
Infrastructure
Results
Manhattan, KS

Frank Anneberg Parking Lot and Trail Mitigation
Infrastructure
Results
Manhattan, KS 66503

Biomanufacturing Plant / Scorpion Biological Services
New Construction, Infrastructure - 500,000 SF
Pending Verification
$650,000,000 CJ est. value
Manhattan, KS 66502

RFQ Construction Manager At Risk - Public Safety Headquarters Facility
New Construction, Infrastructure
Bidding
$11,000,000 CJ est. value
Manhattan, KS 66502

2022 Corrugated Metal Pipe and Bands
Infrastructure
Post-Bid
Manhattan, KS

Browning and Butterfield Waterline Package
Infrastructure
Results
Manhattan, KS

Intersection Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Manhattan, KS 66502

Wastewater Treatment Plant Solids Treatment Upgrade and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Manhattan, KS 66502

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

2021 - 2022 Sidewalk Repairs & Improvements
Infrastructure
Results
Lenexa, KS

Last Updated 10/27/2022 04:22 PM
Project Title

Juliette Ave. & Poyntz Ave. Intersection Improvements

Physical Address View project details and contacts
City, State (County) Manhattan, KS 66502   (Riley County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include but is not limited to the following major categories of work: Item Qty Unit 1. Pavement Removal 1,600 SQYD 2. Concrete Pavement (6" & 7") 1,110 SQYD 3. Curb and Gutter (Type I)(2'-0") 465 LNFT 4. Traffic Signal (Signal Poles Provided by City) 1 LS 5. Storm Sewer (18", 24" & 36") 210 LNFT 6. 8" DIP Class 50 Waterline (In Place) 210 LNFT Questions concerning this bid can be directed to Michael McIntire, Engineer III, michael.mcintire@cityofmhk.com or by phone, (785)- 587-2419.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents