Similar Projects
Construction of Side Stream Storage for Fairhope Sewer Upgrade Phase I
Renovation, Alteration
Bidding
$800,000 est. value
Fairhope, AL

Construction of Lift Station Rehabilitation for Fairhope Sewer Upgrade Phase I
Renovation
Bidding
$400,000 est. value
Fairhope, AL

Bob Jones Lift Station 2021 Improvements (Contract B)
Post-Bid
Scottsboro, AL

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "C" Project
Post-Bid
Tuscaloosa, AL

Baltzell Lift Station Elimination
Results
Anniston, AL 36202

Repair Lift Station And Oil Water Separators
Results
$500,000 to $1,000,000 est. value
Montgomery, AL 36108

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Utlities Lift Station Rehabilitation
Renovation
Bidding
$630,000 est. value
Opp, AL

Proposed Booster Pump Station & Water Line Improvements
New Construction
Post-Bid
$1,500,000 est. value
Smiths Station, AL

Agricultural Trade Center Pump Station Improvements
Results
Cullman, AL 35058

Five Mile Creek WRF Influent Pump Station and Automation
Renovation
Bidding
$3,000,000 to $4,000,000 est. value
Birmingham, AL

Watercress Lift Station and Force Main
Post-Bid
Athens, AL

Econchate WPCP 2020 Improvements Project
Results
$22,996,000 est. value
Montgomery, AL

Lafayette Raw Water Intake, Pump Station, and Plant Modifications
Renovation
Bidding
$500,000 est. value
Lafayette, AL 36862

Raw Water Pump Station Improvements
Renovation
Post-Bid
Tuscaloosa, AL

Last Updated 07/11/2022 11:50 PM
Project Title

Valley Street Lift Station

Physical Address View project details and contacts
City, State (County) Fairhope, AL   (Baldwin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to demolish existing block and mortar building. Remove all existing pumps, controls, and piping. Wet will and existing concrete floor to remain. Divider wall inside wet well to be removed. Wet well to be lined and new submersible pumps. Guide rails, piping and controls installed Fairhope Utilities will be responsible for the by pass pumping while the station is rehabbed.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents