Similar Projects
SP Crossing Apartments
New Construction - 70,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Commerce City, CO 80022

Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Community Center Remodel - Design/Build
Design
Thornton, CO

Service Street Auto Repair / Broomfield
New Construction, Infrastructure - 4,556 SF
Bidding
$1,700,000 CJ est. value
Broomfield, CO 80020

Design Build - Eagle Pointe Recreation Center Kitchen Design, Demolition and Remodel
Renovation
Bidding
$50,000 est. value
Commerce City, CO 80022

Parterre
New Construction
Post-Bid
Thornton, CO 80602

PKAA Bald Mountain Mine Closure Project
Post-Bid
Denver, CO

Outdoor Pool Services
Results
Thornton, CO 80229

Architectural Engineering Services-Overlook at Thornton Apartments
Addition
Results
Less than $16,000,000 est. value
Denver, Thornton, CO 80260

Aspire Aprtments
New Construction - 93,283 SF
Construction
$61,000,000 est. value
Westminster, CO 80031

Heritage at Church Ranch
New Construction - 264,953 SF
Construction
Westminster, CO 80021

Apartment Building
New Construction - 310,000 SF
Pending Verification
Denver, CO 80204

Mcre Apartments
Renovation - 47,850 SF
Pending Verification
Aurora, CO 80011

Cherry Creek West Mixed-Use Development
New Construction
Conception
Denver, CO 80238

Last Updated 07/26/2022 09:01 AM
Project Title

Authentix North Range Apartments

Physical Address View project details and contacts
City, State (County) Commerce City, CO 80022   (Adams County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Park/Playground, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 300-unit apartment complex to include twelve 2 & 3-story buildings. The project site is located on 104th Avenue & Chambers Road. Construction is slated to commence June 2024.

Details

3 Stories Above Grade, Apartments, 300 Unit(s). 3 Stories Above Grade, Disturbed Acre, 16 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents