Similar Projects
Sheboygan River Swing Bridge - City of Sheboygan
New Construction, Infrastructure
Conception
$5,300,000 CJ est. value
Sheboygan, WI 53081

Biggby Coffee / Sheboygan
New Construction, Infrastructure
Design
$500,000 CJ est. value
Sheboygan, WI 53083

Perimeter Road Asphalt Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Plymouth, WI 53073

Pedestrian Bridge Replacement Wade House
Infrastructure
Bidding
$170,000 CJ est. value
Greenbush, WI 53023

North Town Site Development
New Construction, Infrastructure
Post-Bid
$470,000 est. value
Sheboygan, WI

Cth V Pump Station Improvements
Renovation
Post-Bid
$20,891 CJ est. value
Wilson, WI 53085

Orth Drive and Lake Breeze Lane Lift Station
New Construction
Results
Random Lake, WI

Sheboygan Water Utility Raw Water Improvements
New Construction - 4,250 SF
Results
Sheboygan, WI 53083

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tidy Store Gas Station Addition
Addition, Infrastructure - 1,500 SF
Pending Verification
$400,000 CJ est. value
Sheboygan, WI 53081

The Kohler Company Golf Course
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Sheboygan, WI 53081

Random Lake Waste Water Treatment Facility (WWTF)
New Construction, Infrastructure
Bidding
Random Lake, WI 53075

Jimmy Johns - SITE WORK / Plymouth
Infrastructure
Post-Bid
$100,000 CJ est. value
Plymouth, WI 53073

Olive Garden Way
Infrastructure
Results
$685,482 CJ est. value
Sheboygan, WI 53081

Rockline Industries Expansion
Addition, Demolition, Infrastructure
Pending Verification
$19,700,000 CJ est. value
Sheboygan, WI 53081

Last Updated 12/26/2022 11:34 PM
Project Title

Municipal Well No. 3 Well Construction

Physical Address View project details and contacts
City, State (County) Cascade, WI 53011   (Sheboygan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $174,258 [brand] Estimate
Plans Available from Copy Center - 12/06/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction of a new well to serve the Village of Cascade. Well construction consists of drilling a 240-foot deep well with a 12-inch inner casing and a 200-GPM capacity. Other work includes site preparation, erosion control, sampling and testing, development, performance pumping, and water quality analysis. Bid security in the amount of 10 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Performance Bond: 100% Payment Bond: 100% The Work will be substantially completed on or before March 24, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before April 21, 2023. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Attn: Isaac Steinmeyer, PE Short Elliott Hendrickson Inc. 809 North 8th Street, Suite 205 Sheboygan, WI 53081-4032 715.505.4092 Email: isteinmeyer@sehinc.com

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents