Similar Projects
Luxury Vinyl Plank Flooring and Installation
Bidding
$100,000 est. value
Hilton Head Island, SC 29928

Chesnee Middle School Gym Floor Installation
Alteration
Bidding
Chesnee, SC 29323

TOC - Flooring Construction Services
Term Contract
Post-Bid
Charleston, SC 29401

Carpet and Flooring Products and Installation
Post-Bid
Lexington, SC

Quartz Tile Installation in Hallways at Woodruff High School
Results
Less than $65,900 est. value
Woodruff, SC 29388

Hardwood Floors Refinishing Quarters 1
Results
McBee, SC 29101

Kershaw County Lab Upfits
Construction
$150,000 to $180,000 est. value
Camden, SC

Replace Carpet
Alteration
Bidding
Anderson, SC

Fixed Price Solicitation for Finish Flooring Replacement and Installation
Post-Bid
Pendleton, SC 29670

Replacement Bleachers and Floors for Kingstree Middle Magnet School of the Arts
Results
Less than $246,110 est. value
Kingstree, SC 29556

USC Aiken Student Activity Center Flooring Replacement
Alteration
Bidding
Aiken, SC 29801

VCT Maintenance
Post-Bid
Edisto Beach, SC 29438

Summerville Floor Maintenance
Term Contract
Results
Less than $48,600 est. value
Summerville, SC 29483

Fixed Price Carpet Installation
Alteration
Bidding

Environmental Modification
Post-Bid
$10,000 to $100,000 est. value
Columbia, SC

Reported 05/19/2021 12:00 AM
Project Title

Capital Fund Program

Physical Address View project details and contacts
City, State (County) Laurens, SC   (Laurens County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be done shall consist of furnishing all labor, equipment and materials necessary to construct the project as shown on the construction drawings. In general, the work can be briefly described as following: Modifications to Administration Building: replacing floor coverings with V.C.T., painting walls, replacing wood wall paneling with sheetrock, installing a new door way in a concrete block wall, replacing storefront windows and door, installing new security transaction window, removing wall tile in restrooms, removing ceiling texture, painting ceilings, replacing office cabinets and countertops, replacing kitchen cabinets and countertops, and installing a new heating and cooling system. Site Work: installing new or replacing handrails at retaining walls and stairs, filling low areas with top soil and sod, installing new fencing, and installing a new portable storage building.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Flooring, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents