Similar Projects
Upgrade to Potable Water Risers Construction
Alteration
Design
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

Replacement Mechanical Louvers
Alteration
Bidding
Dearborn, MI 48126

North Campus Research Complex Building 80 - Replace Boiler Feed Pump
Alteration
Bidding
Ann Arbor, MI 48109

As-Needed Emergency Mechanical and Plumbing Services
Term Contract
Post-Bid
Waterford, MI 48328

Boiler Repair
Post-Bid
Wakefield, MI 49968

Boiler Replacement at Coolidge,Roosevelt, Riley,Emerson and FHS
Results
Less than $1,895,900 est. value
Livonia, MI

Steam and Condensate Line Replacement at the Big Blue Deck Detroit Metro Airport
Results
MI

Drinking Fountain
Alteration
Bidding
Bangor, MI

TB Simon Power Plant - Install Medium Pressure Steam Boiler
Post-Bid
East Lansing, MI 48823

Boiler Systems
Results
Less than $248,741 est. value
Boyne City, MI

Boiler and Gymnasium Abatement Middle School
Alteration
Bidding
Saline, MI 48176

Boiler Burner Maintenance Bid
Term Contract
Post-Bid
Saginaw, MI 48608

Deaerator and Boiler Feed Pump Skid
Results
Lansing, MI 48901

2019 Bond Issue Projects Middle School Chiller Pre-Purchase
Alteration
Bidding
Plainwell, MI 49080

Alteration of the Existing Mechanical System
Post-Bid
Grand Rapids, MI 49507

Last Updated 10/22/2021 12:51 PM
Project Title

Hot Water Boiler at Pellston Regional Airport

Physical Address View project details and contacts
City, State (County) Pellston, MI 49769   (Emmet County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Aerco boilers to assist the County in replacement of a 20- year old Aerco 2000 boiler at the Pellston Regional Airport. to supply a new Aerco Benchmark 2000 with Edge Controller boiler to Emmet County. The County is seeking to replace the existing Aerco 2000 boiler. The Vendor shall provide the following related to this particular RFP: A. Removal and disposal of existing Aerco BTU boiler B. Connect the new boiler to existing gas line and to existing chimney C. Complete manufacturer start up as required D. Ensure the two boilers communicate and have the ability to share the load E. Complete the job in two (2) days F. Ensure the boiler is operational within eight (8) hours of installation

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents