Similar Projects
Prickly Pear Creek Greenway Trail System - Segment 2 North and Kennedy Park Trails Project
Infrastructure
Bidding
Helena, MT

City ADA Project
Infrastructure
Results
Billings, MT 59102

Phase 1 Distribution System Improvements
Alteration
Post-Bid
Big Timber, MT

Anaconda Stack State Park Parking Lot Improvements
Infrastructure
Post-Bid
$125,000 est. value
Anaconda, MT 59711

Missing Sidewalk or Miscellaneous Project
Infrastructure
Bidding
Billings, MT

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park
Infrastructure
Post-Bid
Billings, MT

24th Street West Central Avenue Signal, Turn Lane, and Pedestrian Improvements
Infrastructure
Results
Billings, MT 59102

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Optimist Park Site Improvements
Infrastructure
Post-Bid
Billings, MT 59101

Ada Ramps Program FY 2022
Alteration
Post-Bid
Helena, MT

Jaycee Park Sidewalk and Shelter Project
Renovation, Infrastructure
Bidding
Dillon, MT

Replace 2 Structures, Grading, Gravel, Pms Overlay, Sidewalk, Curb/Gutter And Guardrail On The Beaver Creek-Wibaux 1 Mile s Wibaux Project Located In Wibaux County
Infrastructure
Post-Bid
MT

Central Park Tennis Courts Replacement
Demolition, Alteration
Bidding
Billings, MT

Reported 02/23/2022 12:00 AM
Project Title

Small Concrete Project

Physical Address View project details and contacts
City, State (County) Billings, MT   (Yellowstone County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: Sidewalk, curb and gutter, and other miscellaneous items.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents