Similar Projects
Sienna Pointe and Heackock Park Apartment Complexes Renovation
Renovation
Conception
$10,000,000 est. value
Moreno Valley, CA 92553

Magnolia Flats
New Construction, Build-Out - 85,900 SF
Conception
Less than $500,000 CJ est. value
Riverside, CA 92506

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Dave's Hot Chicken / Cathedral City
Demolition, New Construction, Infrastructure - 2,675 SF
Design
$800,000 CJ est. value
Cathedral City, CA 92234

Riverside Facility Asphalt Overlay Project
Infrastructure
Post-Bid
Riverside, CA 59968

ADA Improvement Project 31540-42 Railroad Canyon Road
Alteration
Post-Bid
Canyon Lake, CA 92587

2021 Citywide Slurry Seal Project
Infrastructure
Results
$3,200,000 est. value
Murrieta, CA 92562

52nd Avenue Resurfacing Monroe Street to Van Buren Street Project No. D0-0065 and Calhoun Street Reconstruction 54th Avenue to 0.12 Miles North of 52nd Avenue Project No. C9-0012
Infrastructure
Results
$1,390,000 to $1,620,000 est. value
Riverside, CA 92519

Hillcrest HS Portables
New Construction, Infrastructure
Construction
$587,000 CJ est. value
Riverside, CA 92503

Riverside Hotel
New Construction - 215,350 SF
Pending Verification
Riverside, CA 92501

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Pueblo Cannabis
Renovation, Infrastructure - 3,400 SF
Design
$150,000 est. value
Coachella, CA 92236

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

McCall Boulevard Resurfacing
Infrastructure
Results
Menifee, CA 92584

Inland Valley Medical Center Patient Tower
New Construction, Infrastructure - 290,000 SF
Pending Verification
$170,000,000 CJ est. value
Wildomar, CA 92595

Last Updated 10/11/2022 09:11 AM
Project Title

DSRT Surf

Physical Address View project details and contacts
City, State (County) Palm Desert, CA 92260   (Riverside County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Hotel/Motel, Multi-Family Homes, Paving/Reconstruction, Sidewalks/Parking Lot, Single-Family Homes, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $250,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DSRT Surf is a surf anchored resort community nestled into the Desert Willow Golf Course. The project includes a four-story upscale boutique hotel with 92 rooms and an adjacent Surf Center. The hotel sits along the surf lagoon, with ground level amenities including a restaurant, lobby, and lounge, with shaded outdoor patios overlooking the lagoon. The hotel also has an upper level amenity deck for guests that provides a spectacular overview of the lagoon for the guest rooms and balconies, meeting space, and pool bar. The 83 villas are spread throughout with 33 luxury villas and 50 stacked flats around the surf lagoon. As of October 11, 2022, this project is under review with the city. It recently went before the Architectural Review Commission on October 5, 2022 where it received approval for an architecture change. The applicant must now prepare final construction documents. An architect has been selected; however, a general contractor or selection method has not been disclosed. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 267,839 SF - 4 Stories Above Grade, 84,363 SF. 183,476 SF. Parking Spaces, 443 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents