Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Raw Influent Valve, Actuator, & Flowmeter At the Clavey Road Water Reclamation Facility
Infrastructure
Bidding
$550,000 CJ est. value
Highland Park, IL 60035

Raw Influent Valve, Actuator, & Flowmeter At the Clavey Road Water Reclamation Facility
Infrastructure
Bidding
$550,000 CJ est. value
Highland Park, IL 60035

Walking Path
Post-Bid
Lindenhurst, IL 60046

Wickham Court Watermain Extension
Post-Bid
Green Oaks, IL 60048

Hawthorn Hills Square Watermain Replacement
Results
IL

Pekara Watermain Lining Phase 1 and Walmart Fire Loop Lining
Results
Waukegan, IL

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Infrastructure
Design
$200,000 CJ est. value
Lake Bluff, IL 60044

Wingwall Replacement and Culvert Repairs
Infrastructure
Bidding
$600,000 CJ est. value
Libertyville, IL 60048

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Water Main And Sanitary Sewer Improvements
Renovation
Results
Highland Park, IL

Last Updated 07/28/2022 11:08 AM
Project Title

Second Stage Aeration Line Coating

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of prepping surfaces and coating the 36 inch diameter exposed ductile iron low pressure air piping from the Blower and Scrubber building to Operating Gallery C. The line is approximately 300 feet in length. Protective coating shall be applied to any rusted galvanized steel supports.

Details

Division 09 - Finishes, Painting and Coating, Painting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents