Similar Projects
Woodland Elementary School Sidewalk Replacement Project
Infrastructure
Bidding
$45,000 est. value
Southwick, MA 01077

Western Massachusetts Hospital Sidewalk Replacement Project II
Post-Bid
Less than $59,113 est. value
Westfield, MA 01085

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Raynham, Springfield, MA

YTPM 19-0010 Construct Parking Lot, Building 7000
Results
$100,000 to $250,000 est. value
Chicopee, MA

Sidewalk and ADA Improvements and Related Work at Various Locations
Results
Less than $83,000 est. value

South Holyoke Housing Development Project
Post-Bid
Less than $5,900,000 est. value
Holyoke, MA

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,435,682 est. value

STCC AC Sidewalk Replacement Project
Post-Bid
Springfield, MA

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,914,980 est. value

Removal and Replacement of Two Concrete Entrance Ramps on the Basement Level of Chester
Post-Bid
Less than $14,000 est. value
Chester, MA

Clark Building Ramp Replacement Project
Results
Less than $60,060 est. value
Westfield, MA 01085

ADA Ramp Reconstruction Wales Public Library
Post-Bid
Wales, MA 01081

Connecticut River Walk and Bikeway Construction(including Prefabricated Pedestrian Bridge)Medina Street to Ferry Street
Results
Less than $2,723,000 est. value
Chicopee, MA 01013

Replacement of Network Vault Cover 452
Post-Bid
Holyoke, MA

Electric Station Parking Lot and Driveway
Results
$108,000 est. value
Holyoke, MA 01040

Last Updated 07/21/2021 09:21 AM
Project Title

Clark Building Parking - General Bids

Physical Address View project details and contacts
City, State (County) Westfield, MA 01085   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $709,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate The Clark building parking project includes 32 new parking spaces with a storm water system, sidewalks, accessible ramp, and stair at the west entry serving the conference room at the first floor along with two accessible parking spaces at the south entry serving the offices located on the ground level. The project also includes replacement of two exterior entry doors and door hardware at the west entry along with electrical and security devices associated with the entry door replacements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents