Similar Projects
Phase 1 - 2022 Bond Referendum - Folsom School District
Renovation, Infrastructure
Design
$3,500,000 CJ est. value
Millville, NJ 08332

Phase 2 - 2022 Bond Referendum - Folsom School District
Renovation, Infrastructure
Design
$3,500,000 CJ est. value
Millville, NJ 08332

Playground Reconstruction Seabrook Recreation Center
Infrastructure
Bidding
$500,000 CJ est. value
Bridgeton, NJ 08302

Sandwash Outfall Repair
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Vineland, NJ 08361

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Extension (Northeast Avenue to Forest Grove Road)
Infrastructure
Post-Bid
Vineland, NJ 08360

Maintenance Pump Station Repair Contract Statewide - 2022
New Construction
Results
Less than $5,000,000 est. value

Directional Drilling Services
Term Contract, Infrastructure
Results
$200,000 est. value
Vineland, NJ

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

Newcomb Senior Apartments
New Construction, Infrastructure - 124,959 SF
Pending Verification
$20,000,000 CJ est. value
Vineland, NJ 08360

Fiocchi Field Pump Station and Force Main
Infrastructure
Bidding
$5,000,000 CJ est. value
Vineland, NJ 08361

Providing Preventative Maintenance and Repair Services for Lift Station Pumps at Various Cumberland County Locations
Term Contract
Post-Bid
NJ

Cumberland Regional High School Reconstruction of the Existing Student Parking Lot and Bus Drop Off Area
Infrastructure
Results
$3,264,916 CJ est. value
Bridgeton, NJ 08302

Four Seasons At Millville - Phase 3
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Millville, NJ 08332

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

Last Updated 05/10/2023 02:05 PM
Project Title

Gandy's Beach Wastewater Collection and Conveyance System

Physical Address View project details and contacts
City, State (County) Downe, NJ 08349   (Cumberland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 2 Gandys Beach Wastewater Collection and Conveyance System The Bid Award is expected to happen April 2023. The Project includes the following Work: The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work consists of the construction of a gravity sewer system, pump station, and force main within Gandy's Beach that will ultimately connect to the proposed Fortescue WWTP within the Township of Downe. The work shall be completed within 545 calendar days of the Contractor's receipt of written Notice to Proceed. Bids are requested for the following Contract: Contract 2 Gandy's Beach Wastewater Collection and Conveyance System. Separate Bids will be received for the following Contracts: Contract No. Description of Contract 1 Fortescue Collection and Conveyance System 3 Fortescue Wastewater Treatment Plant The non-receipt of any addenda (in the event that any addenda are issued) and the failure of the bidder to acknowledge the receipt of any and all addenda at the time of bid shall be considered a fatal defect in such Bidder's submission and said Bid shall be immediately rejected. Funding Statement the Contract is expected to be funded in part with the funds from the NJDEP, the NJIB and the USDA. Neither the United States nor the State of New Jersey, the NJIB, USDA, nor any of their departments, agencies, or employees is, or will be, a party to the Contract or any lower tier contract or subcontract. The Contract or Subcontract will be subject to regulations contained in N.J.A.C. 7:22-3.1 et seq., 4.1 et seq., 5.1 et seq., 9.1 et seq. and 10 et seq., Local Public Contracts Law, Department of Labor and Workforce Development Current Wage Rate Determination, Prevailing Wage Act, Contract Work Hours and Safety Standard Act, Copland Act, Davis Bacon Act, Buy American Clause, Debarment and Suspension, and Socially and Economically Disadvantaged (SED) (N.J.A.C. 7:22-9.1 et seq.). Pursuant to N.J.S.A. 10:5-33: "Bidders are required to comply with the requirements of P.L. 1975, c.127." All bidders are encouraged to include a commitment to the use of small, minority, women's and labor surplus area businesses and shall be in conformity with N.J.A.C. 7:22-3.17(a)(24) and 7:22-4.17(a)(24) with a goal of not less than 10% participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SED's). Further details regarding special requirements of contractors to comply with the Project Plan developed by the owner for SED participation are included in the Information for Bidders and the Supplemental General Conditions. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the Unites States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron. Protected Eagles and Ospreys Acknowledgment The Contractor must follow NJDEP Regulations established under CAFRA Permit No. 0604-18-005.2 LUP210001, which was approved on October 14, 2021, and is valid until October 13, 2026. To protect sensitive habitat for the state-listed bald eagle, the Contractor shall adhere to a seasonable restriction on the use of heavy construction equipment/machinery within 1,000 feet of any active bald eagle nest along the project limit of disturbance from January 1 through July 31 of each calendar year. Additionally, the Contractor shall adhere to the Bald and Golden Eagle Protection Act and work in accordance with National Bald Eagle Management guidelines. To protect sensitive habitat for the state-listed osprey, the Contractor shall adhere to a seasonal restriction on the use of heavy construction equipment/machinery within 1,000 feet of any active osprey nest along the project limit of disturbance from April 1 through August 31 of each calendar year. The initiation and implementation of work which generates disturbance (e.g., sound levels, visual interruption) that is out of character with what currently exists at or surrounding the anticipated work area during the restricted time period recommended above may result in the Contractor being in violation of the "take" clause within state of New Jersey Endangered and Nongame Species Conservation Act (N.J.S.A. 23:2A-1). Please note that adherence to this seasonal restriction shall also be applied if nest building activity is observed at any given osprey nest location prior to April 1 of the given calendar year of work. Bid Bond A 5% Bid Bond of the Total Bid Amount is required.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents